A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:
* Provide scalable high-performance networking with layer-3 termination at top-of-rack
* Protect workloads from switch/NIC/rack failure
* Provide isolation for DMZ workloads
* Provide at-least 25Gbps dedicated bandwidth to backup traffic
* Easily accept workloads on traditional VLAN-backed networks
* Fully-supported by VMware
Which three design considerations meet all of these requirements? (Choose three.)