A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty-four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:
- Provide scalable high-performance networking with layer-3 termination at top-of-rack
- Protect workloads from switch/NIC/rack failure
- Provide isolation for DMZ workloads
- Provide at-least 25Gbps dedicated bandwidth to backup traffic
- Easily accept workloads on traditional VLAN-backed networks
- Fully-supported by VMware
Which three design considerations meet all of these requirements? (Choose three.)