Valid LEED-Green-Associate Dumps shared by ExamDiscuss.com for Helping Passing LEED-Green-Associate Exam! ExamDiscuss.com now offer the newest LEED-Green-Associate exam dumps, the ExamDiscuss.com LEED-Green-Associate exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com LEED-Green-Associate dumps with Test Engine here:
Which action promotes pedestrian access to a project site?
Correct Answer: D
Utilizing an existing community nature path connecting the building to surrounding buildings is an action that promotes pedestrian access to a project site. Pedestrian access is the ability of people to walk to and from a project site safely and comfortably. A community nature path is a type of pedestrian infrastructure that provides a pleasant and scenic route for walking, as well as environmental benefits such as habitat creation, stormwater management, and heat island reduction. The other options are not actions that promote pedestrian access to a project site. Placing a low speed limit in the parking lot around the building is an action that enhances pedestrian safety within the project site, but does not improve pedestrian access to the project site. Providing shuttle access between the project site and a local transit center is an action that encourages alternative transportation, but does not promote pedestrian access to the project site. Designating parking spaces closest to the building for exclusive use by carpooling vehicles is an action that reduces vehicle trips and emissions, but does not promote pedestrian access to the project site. Reference: LEED Green Associate Candidate Handbook, page 30; USGBC, [Location & Transportation], page 3.