Next Question >>

Question 1/23

What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (23q)
Question 1: What is the different between the benchmaking and the repeti...
Question 2: You are running an SAP ECC system. For which of the followin...
Question 3: The SUM procedure stops with an error during uptime. How can...
Question 4: You are running an SAP ECC system with SAP_BASIS 740, non-Un...
Question 5: What are the benefits of using the Benchmarking option of th...
Question 6: What phases of SUM will be executed during an SAP S/4HANA co...
Question 7: When using the DMO of SUM, which files can be handled by SUM...
Question 8: SUM was registered at the SAP Host Agent. Based on which inf...
Question 9: You want to perform an SAP S/4HANA conversion using SUM with...
Question 10: You are performing an SAP S/4HANA conversion for your produc...
Question 11: What is the minimum SAP_BASIS release of an SAP ECC system t...
Question 12: You are upgrading a three-system landscape DEV - QAS - PRD. ...
Question 13: You are performing an inplace SAP S/4HANA conversion includi...
Question 14: You are executing a standard SUM procedure to update an SAP ...
Question 15: Which maintenance events are possible with SUM for an SAP sy...
Question 16: You want to use the downtime-optimized data conversion for y...
Question 17: Which Guides contain information about SUM phases starting w...
Question 18: Unicode migration ECC on MaxDB to HANA in scale out what sho...
Question 19: What can you achieve by setting the SUM parameter "migration...
Question 20: During a SUM run you want to check if the phase SHADOW_IMPOR...
Question 21: During the configuration of the DMO for SUM, how does the to...
Question 22: Which of the following SUM activities require a stack XML fi...
Question 23: In which scenarios do you need to use SUM 2.0 instead of SUM...