Valid FlashArray-Implementation-Specialist Dumps shared by EduDump.com for Helping Passing FlashArray-Implementation-Specialist Exam! EduDump.com now offer the newest FlashArray-Implementation-Specialist exam dumps, the EduDump.com FlashArray-Implementation-Specialist exam questions have been updated and answers have been corrected get the newest EduDump.com FlashArray-Implementation-Specialist dumps with Test Engine here:
During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?
Correct Answer: C
During a hardware upgrade, physical components are often moved or handled, leading to potential connection issues. If a specific port (like CT0.ETH14) that is expected to carry traffic shows 0.00 b/s and "Link Down" or similar status immediately after the controller is initialized, the most likely physical issue is an improperly seated transceiver (SFP) or cable. The standard troubleshooting hierarchy dictates checking Layer 1 (Physical) first. Therefore, the engineer should ensure the SFP in CT0.ETH14 is fully seated and re-seat it if necessary. SFPs can easily become slightly dislodged during the cable swap from the old controller to the new one. Checking the seating is a quick, non-disruptive step that resolves a high percentage of "dead port" issues during upgrades. Swapping to a management port (Option A) is invalid because management ports often have different speeds or configurations, and asking the customer to reboot hosts (Option B) is premature and potentially disruptive before ruling out the physical array connection. =========