During project execution, the risk owner is monitoring the critical speed rate of a power engine to eventually trigger the defined risk-response strategy. During the risk assessment and management process phase, it was defined that the power engine has the following characteristics 1,600 rpm (rate-per-minute) -> stops working and crashes the system 1.500 rpm (rate-per-minute) -> warns of max rate allowed 1.400pm (rate-per-minute) -> reduces the power and brakes the engine Which of the following statements is correct?