<< Prev Question Next Question >>

Question 38/342

A company is considering developing a new, complex application that will require a large initial investment.
However, if successful, the profit potential is high.
When preparing an analysis, what should be used to encourage stakeholders who are concerned about project failure to authorize the initial investment?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (342q)
Question 1: The backlog is ordered by:
Question 2: A product owner for two highly visible projects spends a gre...
Question 3: After completing the release plan, the team realizes that th...
Question 4: In an Agile approach, at which meeting does a team examine t...
Question 5: While developing a story during the iteration, team discover...
Question 6: Midway through a sprint, a team member discovers that the pr...
Question 7: Which of the following is NOT a principle of the Agile Manif...
Question 8: An event management team is following an agile approach to p...
Question 9: Which of the following would be most likely to assist when a...
Question 10: Extreme Programming (XP) includes which of the following pra...
Question 11: Throughout the project, an agile practitioner notices that o...
Question 12: In Agile projects, the technique in which planning is done a...
Question 13: Midway through a sprint, the scrum master identifies that re...
Question 14: Which chart shows the total number of story points completed...
Question 15: Choose the correct combination of XP practice names from the...
Question 16: What should a Scrum Master do when one team member falls beh...
Question 17: The purpose of the iteration retrospective is to:...
Question 18: Which best describes the attributes of the IN VEST criteria ...
Question 19: Applying the Pareto rule when prioritizing the Product Backl...
Question 20: Kanban cards should always be written using User Stories....
Question 21: The risk profile of a project has increased beyond the upper...
Question 22: Spike solutions are small standalone programs that demonstra...
Question 23: The cost estimation techniques used on Agile projects are:...
Question 24: Of the listed options, which BEST describes User Stories?...
Question 25: Which of the following tests verify that units and combinati...
Question 26: An agile project leader is delivering a team kick-off sessio...
Question 27: Suppose your team is working to create a commercial website ...
Question 28: During a sprint review, the product owner identifies a requi...
Question 29: Which of the following is NOT true about the Iteration Demos...
Question 30: Which of the following is an Agile Manifesto principle?...
Question 31: Which of the following statements is an accurate value state...
Question 32: Who specifies Acceptance Tests in an Agile Project?...
Question 33: An agile team's client has been asked to expedite the delive...
Question 34: Suppose the current release will be complete after 6 two-wee...
Question 35: Due to its complexity, a new team member struggles with deve...
Question 36: Every Project Management Life Cycle (PMLC) has a sequence of...
Question 37: What Agile concept expresses delivering value in slices rath...
Question 38: A company is considering developing a new, complex applicati...
Question 39: It is not possible to have a fixed price contract in Agile....
Question 40: Which of the following is part of the 12 practices defined i...
Question 41: When does Adaptation occur in Scrum?...
Question 42: What is the reason to develop personas as part of User Story...
Question 43: Spike solutions are appropriate when:...
Question 44: The feedback from the Sprint Review impacts the next Sprint ...
Question 45: Technical debt is the total amount of less-than perfect ____...
Question 46: Which of these statements is NOT correct about Ideal time an...
Question 47: A team is transitioning from a predictive approach to an agi...
Question 48: An agile team lead is assigned to a project that must ensure...
Question 49: Affinity Estimating is a technique many teams use to quickly...
Question 50: The Kaizen philosophy is change:...
Question 51: According to DeMarco, Fragmented knowledge workers may look ...
Question 52: Midway through an iteration, an agile team learns that a tea...
Question 53: Which of the following is a weakness of an Adaptive PMLC Mod...
Question 54: Which of the following defines the splitting of a story or a...
Question 55: Which of the following is NOT an attribute of a Good Story?...
Question 56: Senior management is frustrated at the lack of a detailed im...
Question 57: During a project meeting, a team is faced with a difficult d...
Question 58: Which of the following is the hierarchy of User Story creati...
Question 59: Prior to a retrospective, discussions among team members ind...
Question 60: Typically calculated in story points, this is the rate at wh...
Question 61: On what should an agile team work to achieve predictable flo...
Question 62: Traditional Project Management uses the Work Breakdown Struc...
Question 63: A term used to describe the work that can be delivered which...
Question 64: The customer needs assistance in determining the efficiency ...
Question 65: Drag and Drop Question Match the response options to each le...
Question 66: Drag and Drop Question The PM Declaration of Interdependence...
Question 67: The term "last responsible moment" refers to the moment at w...
Question 68: Which of the following best represents both a principle of t...
Question 69: What type of time estimation excludes non-programming time?...
Question 70: Which of the following is not part of Agile Discovery?...
Question 71: Kanban means________in Japanese?...
Question 72: Traditional project management uses requirement decompositio...
Question 73: Drag and Drop Question Sequence the steps to User Story Mapp...
Question 74: "Fail Sooner" is a benefit of Incremental Development....
Question 75: The Japanese terms for an Agile developmental mastery model ...
Question 76: After three iterations, the problems impeding an Agile team ...
Question 77: Which of the following techniques best encourages osmotic co...
Question 78: A meeting where a team looks back on a past period of work s...
Question 79: Which of the following documents defines the functional and ...
Question 80: During the review session, the product owner discovers that ...
Question 81: Pick the THREE statements that are true about Agile Analysis...
Question 82: Which of the following 2 statements are TRUE about Product R...
Question 83: An agile team is beginning a new release. Things are progres...
Question 84: When was Scrum first introduced?...
Question 85: Which role is external to the Scrum Team but provides a skil...
Question 86: An Agile team best ensures product quality through:...
Question 87: What does acronym DRY stand for?...
Question 88: Team A is producing 61 points per iteration and Team B is pr...
Question 89: The Project Manager plays the following role in Scrum:...
Question 90: Triple Nickels is a technique used in what kind of meeting?...
Question 91: What does Scrum mean by Transparency?...
Question 92: Well-written User Stories that follow the INVEST model inclu...
Question 93: Who is NOT part of the Scrum Team?...
Question 94: In Pair Programming, one programmer is responsible for all t...
Question 95: In the Lean process, the focus is on:...
Question 96: Agile development prevents technical debt....
Question 97: Which of the following is NOT recognized as a "unit" that ca...
Question 98: Continuous integration ensures that a product is:...
Question 99: Which is the first step in setting up Kanban?...
Question 100: Project managers use velocity to determine:...
Question 101: During a six-week iteration, an issue is identified by a tea...
Question 102: (Exhibit) Based on the chart, what is the current status of ...
Question 103: To ensure the success of our project, in what order should w...
Question 104: The scrum master for a large project must provide an estimat...
Question 105: A development team and product owner disagree on a user stor...
Question 106: On what should Agile estimates be based?...
Question 107: The Scrum Master's job is to work with the Scrum Team and th...
Question 108: eXtreme Programming (XP) teams strive to avoid:...
Question 109: A project's first iteration contains item A, and its second ...
Question 110: A technical problem arises that will likely impact the stori...
Question 111: A high-performance Agile team:
Question 112: A development team, new to scrum, questions the need to coll...
Question 113: What Agile planning artifact is updated minimally once a yea...
Question 114: When does a Sprint get canceled or end early?...
Question 115: _____________ an estimate refers to estimating a story based...
Question 116: A ScrumMaster:
Question 117: A technique in which a team collaboratively discusses accept...
Question 118: Retrospectives provide an opportunity for the team to:...
Question 119: If the Development Team does not have all the skills to acco...
Question 120: A 4-hour Sprint Planning meeting is typical for a Sprint or ...
Question 121: At the end of a product development phase, an agile project ...
Question 122: Frequent verification and validation is key in Agile but eac...
Question 123: In Scrum, the definition of "done" is created by everyone EX...
Question 124: A product's scope and acceptance criteria have been defined,...
Question 125: After a successful product deployment, a key stakeholder inf...
Question 126: Which of the following is NOT true about Retrospective?...
Question 127: Which of the following sets of tools is least likely to be u...
Question 128: Which 5 roles are defined by Extreme Programming? (Choose fi...
Question 129: Which development mastery model of skill acquisition lies in...
Question 130: Which of the following is a STORY?...
Question 131: Which 2 are goals of Lean Software Development? (Choose two....
Question 132: A company is moving into a new space and is determining the ...
Question 133: The best reason for extreme character personas in writing us...
Question 134: Drag and Drop Question When reading a burn-down chart, what ...
Question 135: A new agile team member notices that the team's current proc...
Question 136: What should a team consider when calculating the effort need...
Question 137: This role champions the products, provides the budget and su...
Question 138: The Agile artifact that describes the incremental nature of ...
Question 139: What are the 5 values of Agile Modeling?...
Question 140: A project team estimates that they should complete 30 story ...
Question 141: Wideband Delphi is a repeatable process that can be used :...
Question 142: Personas are used in Agile requirements to depict which type...
Question 143: What is the responsibility of an extreme Programming (XP) cu...
Question 144: What is a product roadmap?
Question 145: On a risk map or a risk heat map, the vertical and horizonta...
Question 146: A product owner, new to the role, is very enthusiastic about...
Question 147: Business stakeholders of an agile project frequently skip th...
Question 148: Acronym describing the attributes of a product backlog:...
Question 149: An iteration takes place in a time frame with specific start...
Question 150: What can an agile team use to prioritize stories?...
Question 151: What is the best description of the relationship between Scr...
Question 152: A product owner asks a newly formed scrum team how many stor...
Question 153: What is the ideal approach for an Agile project manager to t...
Question 154: During a planning session, four out five team members vote t...
Question 155: Who tracks work remaining in the Product Backlog?...
Question 156: Which one is NOT a level of need in the Kano Model?...
Question 157: During a retrospective meeting, a team develops a large list...
Question 158: A key component of Agile software development is:...
Question 159: Sometimes stories are too small. A good approach for tiny st...
Question 160: In eXtreme Programming (XP), analysis, design, coding, and t...
Question 161: How can an agile team working on a new product ensure alignm...
Question 162: Scrum dictates the use of User Stories....
Question 163: Risk exposure is the:
Question 164: After seeing the planned features for an upcoming release, a...
Question 165: What is the normal time estimate for a research story?...
Question 166: Drag and Drop Question Match each activity (on the left) to ...
Question 167: Drag and Drop Question While managing the Agile Product Life...
Question 168: When working with a globally distributed team, the most usef...
Question 169: An executive requests information regarding a sprint status....
Question 170: The product owner should spend at least 3 hours per day with...
Question 171: Which of the following BEST describes error-feedback ratio?...
Question 172: What is a high-level representation of the features or theme...
Question 173: Suppose 8 new members joined the development team, and the t...
Question 174: Drag and Drop Question Match the story types on the left to ...
Question 175: The executive leadership wants to understand ways to better ...
Question 176: At minimum, all Kanban boards should have the following colu...
Question 177: An agile team is unable to complete all its planned sprint u...
Question 178: The 3 items are required for an Agile, adaptive environment:...
Question 179: Drag and Drop Question Match a definition (on the right) to ...
Question 180: Scrum is both an iterative and incremental Agile process....
Question 181: How long is the Sprint Planning meeting?...
Question 182: What is used to provide a simple medium for gathering basic ...
Question 183: A client states that a product is not being built as request...
Question 184: An agile team notices that the same problems continue to occ...
Question 185: All of the following occur in the second half of the Sprint ...
Question 186: A new product owner needs to manage the backlog of a high-vi...
Question 187: The purpose of Work in Progress (WIP) limits is to prevent t...
Question 188: What Agile planning artifact is created by the Product Owner...
Question 189: An organization adopts Agile practices and implements an inc...
Question 190: While attending a conference, an agile practitioner learns o...
Question 191: In agile approaches, negotiation is viewed as:...
Question 192: What can a team use to prioritize stories?...
Question 193: Which is a report of all the work that is "done"?...
Question 194: In Agile development, what is the term for the internal thin...
Question 195: This Emertxe Project Management (MPx) approach is when neith...
Question 196: One of your stakeholder is interested in viewing the project...
Question 197: Which of the following frameworks has the following practice...
Question 198: Which should NOT take place at the daily Scrum?...
Question 199: Scrum is a software development methodology....
Question 200: A project team realizes that an important task on the iterat...
Question 201: The amount of information captured in the project's defects ...
Question 202: No one but the Scrum Team attends the Sprint Planning meetin...
Question 203: The Agile Manifesto value "customer collaboration over contr...
Question 204: A team is delivering work as per the sprint plan, and team v...
Question 205: Self-organizing teams are characterized by their ability to:...
Question 206: What is the role in an eXtreme Programming (XP) project that...
Question 207: A story point is the:
Question 208: What type of process control is Scrum?...
Question 209: Drag and Drop Question How do you read a burndown bar chart?...
Question 210: Following a successful product release, senior management as...
Question 211: Product Backlog Items (PBI) described as emergent, are expec...
Question 212: Toward the end of a project, the product owner discovers tha...
Question 213: The following is a picture of which of the following Informa...
Question 214: During backlog refinement meeting, the new developer on the ...
Question 215: The ultimate goal of __________ is to deploy all but the las...
Question 216: An agile practitioner wants to communicate the effect of tec...
Question 217: An agile project manager notices that the product owner mana...
Question 218: For a "caves and commonroom arrangement, the most appropriat...
Question 219: The agile practitioner has determined that two different tea...
Question 220: A scrum team has conducted regular retrospectives to discuss...
Question 221: An agile team identifies that their velocity is lower than p...
Question 222: Who is responsible for maximizing the value of the product?...
Question 223: When maintaining the product backlog, this role represents t...
Question 224: A product owner concludes that the majority of a project's v...
Question 225: In Scrum, Sprints are never longer than a calendar month....
Question 226: A team's technical lead believes that manual testing tasks s...
Question 227: Incremental delivery means that:...
Question 228: When we practice active listening, what are the levels throu...
Question 229: A product owner adds a 21-point, high-priority story to a sp...
Question 230: This artifact contains release names with expected dates and...
Question 231: An agile practitioner becomes a Scrum Master on an establish...
Question 232: Setting up development work in a way that the team can figur...
Question 233: Which of the following is NOT considered an enterprise Agile...
Question 234: The team is refining user stories during the backlog groomin...
Question 235: All of the following are TRUE about communicating on distrib...
Question 236: Which of the following charts shows the total number of stor...
Question 237: Drag and Drop Question Order the 5 focusing steps of the The...
Question 238: A project manager is concerned that the team has misaligned ...
Question 239: Based on the following information, determine the number wee...
Question 240: An agile team is under pressure to deliver an application. T...
Question 241: Testing that often occurs between "Done" and "Done, Done" is...
Question 242: How is the Retrospective meeting BEST conducted?...
Question 243: Refactoring is a key way of preventing technical debt....
Question 244: Which Agile method promotes the practice of risk-based Spike...
Question 245: Which list below includes the attributes of a good User Stor...
Question 246: Pick the two PMLC models that are based upon the Agile Proje...
Question 247: The purpose of a project burndown chart is to:...
Question 248: A team identifies the number of threats and lists them in th...
Question 249: Midway through a sprint, a scrum team member advises the tea...
Question 250: An agile team is working on a new product. To ensure that al...
Question 251: All of the following are metrics used in Agile except:...
Question 252: What are three processes used to begin an Agile project?...
Question 253: Which of the following will NOT assist in Critical Problem s...
Question 254: The way that we calculate the number of years it takes to br...
Question 255: Suppose your team velocity is 8 story points, and the produc...
Question 256: When interacting with team members, the Agile project manage...
Question 257: Which are some of the most important benefits of an Agile te...
Question 258: The most powerful capability of Scrum teams is that they:...
Question 259: Which of the following is an Agile improvement technique to ...
Question 260: Agile project management and product development use several...
Question 261: An agile team has been given a complex project with a basic ...
Question 262: A business analyst has identified a new risk in an Agile pro...
Question 263: During a daily stand up meeting, a developer expresses conce...
Question 264: An agile team has been in place for five years and the custo...
Question 265: What is the definition of velocity?...
Question 266: A senior team member feels underutilized. What should the ag...
Question 267: When can a plan be changed in Agile Management?...
Question 268: Scrum practices are facilitated by the:...
Question 269: Non-functional requirements should be written as user storie...
Question 270: During the daily standup meeting, a team member states that ...
Question 271: During a current sprint, a team member asks permission from ...
Question 272: In Scrum, who is responsible for managing the team?...
Question 273: Process Tailoring is the iterative approach implementing you...
Question 274: Midway through a project, the product owner learns from the ...
Question 275: What is a Japanese term used in Lean software development is...
Question 276: Drag and Drop Question Pick which 3 activities are the respo...
Question 277: Drag and Drop Question Match the following roles on the righ...
Question 278: What are the three pillars of Scrum?...
Question 279: More details for a story are required before the upcoming sp...
Question 280: The purpose of a Sprint retrospective is for the Scrum team ...
Question 281: Why should an agile coach model agile principles and behavio...
Question 282: A seven-member agile team's composition varies considerably ...
Question 283: What is the name of this facilitated process? One or more te...
Question 284: The key elements of a user story in Agile development are:...
Question 285: Drag and Drop Question Match the following: (Exhibit)...
Question 286: Which type of estimation refers to splitting a story into sm...
Question 287: When a team member encounters an issue in an agile environme...
Question 288: Which Agile method goes through the following stages: (Exhib...
Question 289: Which of the following technique of Scrum requires that ever...
Question 290: Refactoring, as it applies to the practice of extreme Progra...
Question 291: Which of the following is NOT one of the 12 core practices o...
Question 292: Team A is working on the second sprint of a product release....
Question 293: What is the purpose of practicing asking the "5 Why's"?...
Question 294: Stakeholders have conflicting requirements, and the product ...
Question 295: During project inception, an agile practitioner engages the ...
Question 296: Your project management office (PMO) has suggested your proj...
Question 297: Who is responsible for ordering the Product Backlog?...
Question 298: An agile team delivered a feature in the last iteration. The...
Question 299: Which of the following is NOT one of the 12 core practices o...
Question 300: The acronym for a good product backlog is DEEP. What does it...
Question 301: When prioritizing features to be delivered in an iteration, ...
Question 302: During product development, changes in technology and regula...
Question 303: During a project review, the team discovers customer feedbac...
Question 304: The following chart lists stories for a release of an Agile ...
Question 305: During sprint retrospectives, some team members are very voc...
Question 306: The PMO has asked you to generate some financial information...
Question 307: An agile coach is assigned to help a project team that was r...
Question 308: Project X has an IRR of 12%, and Project Y has an IRR of 10%...
Question 309: During a daily stand up, the tester engages the developer in...
Question 310: Which of the following is NOT a reason to use a Feature Brea...
Question 311: Which Agile framework adopts and tailors methods such as Scr...
Question 312: What should a team do when they complete all sprint goals ea...
Question 313: This Agile methodology's properties include Focus, Osmotic C...
Question 314: In which meeting do you capture lessons learned?...
Question 315: On an agile project, some of the development team is struggl...
Question 316: For a one month Sprint, what is the recommended duration of ...
Question 317: The smallest amount of functionality that delivers customer ...
Question 318: When we use the term "container" in Scrum what are we referr...
Question 319: Select the statements that are TRUE about the Product Owner....
Question 320: Assuming one-week iterations and a team of four developers, ...
Question 321: What can be described as "one or two written sentences; a se...
Question 322: Drag and Drop Question Sequence the core practices of Kanban...
Question 323: Drag and Drop Question Match each Agile requirement type (on...
Question 324: Which of the following factor will not assist in improving t...
Question 325: Having problems does not indicate a problem in itself, so we...
Question 326: The Project Leader's primary responsibilities are to "move b...
Question 327: Which of the following are 2 attributes of Exploratory testi...
Question 328: One of your stakeholder wants more detail than the vision st...
Question 329: In reference to Scrum, each sprint should produce:...
Question 330: Emotional intelligence includes all of the following except:...
Question 331: A cross-functional team in Scrum consists of which types of ...
Question 332: During a retrospective, team members suggest process improve...
Question 333: Backlog Grooming and Backlog Refinement are the same thing....
Question 334: When is the ideal time to hold a retrospective?...
Question 335: 80% of the value comes from 20% of the work. Which law is th...
Question 336: Which one is NOT a reason to perform a Spike?...
Question 337: Team members who are part-time on your project will see at l...
Question 338: Pareto Analysis is the exercise of determining what 40% of f...
Question 339: An agile project leader notices that the team's velocity has...
Question 340: If there are multiple Scrum teams working on a product, each...
Question 341: This role would be responsible for determining when a releas...
Question 342: Which of the following is NOT one of the 5 common conflict t...