Question 370/504

Which of the Perform Quality Assurance tools and techniques may enhance the creation of the work breakdown structure (VVBS) to give structure to the decomposition of the scope?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (504q)
Question 1: How can a project manager maintain the engagement of stakeho...
Question 2: How can a project manager evaluate project team development?...
Question 3: A project team member is discussing a new project with their...
Question 4: An input used in developing the communications management pl...
Question 5: The project scope statement and resource calendars are input...
Question 6: Identify Risks is part of which Process Group?...
Question 7: The following is a network diagram for a project. (Exhibit) ...
Question 8: Conditions that are not under the control of the project tea...
Question 9: A project team is discussing an upcoming planned product lau...
Question 10: When cost variance is negative and schedule variance is posi...
Question 11: The definition of operations is a/an:...
Question 12: What earned value (EV) measure indicates the cost efficiency...
Question 13: At the start of a typical project life cycle, costs are:...
Question 14: A project team working on an automobile manufacturing projec...
Question 15: Impacts to other organizational areas, levels of service, an...
Question 16: An output of the Validate Scope process is:...
Question 17: A new project manager is assigned to a high-visibility proje...
Question 18: Which items are components of a project management plan?...
Question 19: During which process does a project manager review all prior...
Question 20: How can a project manager maintain the engagement of stakeho...
Question 21: Which of the following is an input to Direct and Manage Proj...
Question 22: The degree, amount, or volume of risk that an organization o...
Question 23: Which of the in an adaptive project environment, which actio...
Question 24: Scope, schedule, and cost parameters are integrated in the:...
Question 25: Which type of risk diagram is useful for showing time orderi...
Question 26: When would resource leveling be applied to a schedule model?...
Question 27: Perform Quality Control is accomplished by:...
Question 28: The handoff of the first version of a software application t...
Question 29: A project reports an earned value (EV) of USS45 for work com...
Question 30: An input to the Create WBS process is a:...
Question 31: The process of identifying and documenting the specific acti...
Question 32: How can a project manager represent a contingency reserve in...
Question 33: Ensuring that both parties meet contractual obligations and ...
Question 34: As the project progresses, which of the following is routine...
Question 35: A project manager managing a cross-cultural virtual project ...
Question 36: The correct equation for schedule variance (SV) is earned va...
Question 37: Which of the following tools and techniques is used in the V...
Question 38: Which statement is true about the project management body of...
Question 39: Which of the following are components of the technical proje...
Question 40: Which of the following is an input to the Develop Project Ch...
Question 41: A practitioner organized a requirements workshop with the cl...
Question 42: In which Project Management Process Group is the project cha...
Question 43: What is the responsibility of the project manager and the fu...
Question 44: A given schedule activity is most likely to last four weeks....
Question 45: What is the purpose of the Manage Quality process?...
Question 46: Information collected on the status of project activities be...
Question 47: Power, urgency, and legitimacy are attributes of which stake...
Question 48: Types of internal failure costs include:...
Question 49: What behavior refers to leadership style?...
Question 50: Which of the following are outputs of the Define Scope proce...
Question 51: What is a tailoring consideration for the application of Pro...
Question 52: The project management processes presented in the PMBOK Guid...
Question 53: A reward can only be effective if it is:...
Question 54: A team was hired to develop a next generation drone. The tea...
Question 55: What benefit does the Manage Stakeholder Engagement process ...
Question 56: What are the two most common contract types used in a projec...
Question 57: During project execution, a team member has identified and t...
Question 58: All testing on a project has been performed successfully and...
Question 59: Which grid shows which resources are tied to work packages?...
Question 60: Project Scope Management is primarily concerned with:...
Question 61: Processes in the Planning Process Group are typically carrie...
Question 62: An output of the Manage Stakeholder Engagement process is:...
Question 63: Which statement about identification and engagement of stake...
Question 64: Which of the following characteristics are found in a functi...
Question 65: A business manager wants to start a project to launch a new ...
Question 66: A technical project manager uses a directive approach with t...
Question 67: One of the tools and techniques of the Manage Project Team p...
Question 68: A project receives budget approval, but the risk of extra co...
Question 69: In which domain of project management would a Pareto chart p...
Question 70: Which process uses occurrence probability and impact on proj...
Question 71: The project leam is brainstorming on approaches to deliver t...
Question 72: A project manager is reporting the project performance as 25...
Question 73: Which output is the approved version of the time-phased proj...
Question 74: When an activity cannot be estimated with a reasonable degre...
Question 75: Which of the following involves making information available...
Question 76: Which project management process is used by the project mana...
Question 77: A project team identifies defects that will require a modifi...
Question 78: A project team submits a weekly progress report to the proje...
Question 79: Stakeholders can be identified in later stages of the projec...
Question 80: In one of the project meetings during project execution, a n...
Question 81: When managing costs in an agile environment, what should a p...
Question 82: Which knowledge area includes the processes to identify, def...
Question 83: An input to the Perform Integrated Change Control process is...
Question 84: If the most likely duration of an activity is five weeks, th...
Question 85: A method to manage stakeholder expectations in the scope sta...
Question 86: Which scenario is most desirable during the execution phase ...
Question 87: Which tool or technique is required in order to determine th...
Question 88: A project manager is searching for solutions that bring some...
Question 89: When a backward pass is calculated from a schedule constrain...
Question 90: Fast tracking is a schedule compression technique used to sh...
Question 91: The number of potential communication channels for a project...
Question 92: High-level project risks are included in which document?...
Question 93: A production support system is being managed by a team. The ...
Question 94: Why is required in a project?
Question 95: Which process documents the business needs of a project and ...
Question 96: Change requests, project management plan updates, project do...
Question 97: When project requirements are documented in user stones then...
Question 98: Match each dimension of the communications management plan t...
Question 99: What characteristic of servant leadership supports resource ...
Question 100: A project manager is working with the project sponsor to ide...
Question 101: In which type of contract are the performance targets establ...
Question 102: Which is an example of Administer Procurements?...
Question 103: Which component of the human resource management plan descri...
Question 104: The PV is $1000, EV is $2000, and AC is $1500. What is CPI?...
Question 105: What is an emerging practice in stakeholder engagement?...
Question 106: What process is included in Project Integration Management?...
Question 107: What process group includes processes performed to complete ...
Question 108: When sequencing activities, what does the common acronym FF ...
Question 109: Which activity involves ensuring that the composition of a p...
Question 110: A project manager is preparing to meet with three crucial pr...
Question 111: What tool or technique is primarily used to plan risk respon...
Question 112: Who provides the inputs for the original estimates of activi...
Question 113: Match the project life cycle type with its corresponding def...
Question 114: A tool or technique used in the Control Procurements process...
Question 115: What do top project managers do to maximize their sphere of ...
Question 116: The iterative and interactive nature of the Process Groups c...
Question 117: Which of the following schedule network analysis techniques ...
Question 118: Which of the following are outputs from the process of creat...
Question 119: What should a project manager do to prepare a risk managemen...
Question 120: Which of the following strategies is used to deal with risks...
Question 121: Which of the following technology platforms is most effectiv...
Question 122: Organizations perceive risks as:...
Question 123: An adaptive project team is meeting for the first time and d...
Question 124: Define Activities and Estimate Activity Resources are proces...
Question 125: A project is just beginning, and management creates a long l...
Question 126: Which tools and techniques will a project manager use to dev...
Question 127: Which are examples of processes that may be used once or at ...
Question 128: For a stakeholder with low interest and high power, the proj...
Question 129: A project manager was assigned to a project to implement a m...
Question 130: While preparing the project management plan on a weekly basi...
Question 131: Which Define Activities tool or technique is used for dividi...
Question 132: In what type of organizational structure does a project mana...
Question 133: The probability and impact matrix is primarily used to:...
Question 134: Which type of dependency used in the Sequence Activities pro...
Question 135: Funding limit reconciliation is a tool and technique of whic...
Question 136: Labor, materials, equipment, and supplies are examples of:...
Question 137: How can emotional intelligence (EI) be effective in project ...
Question 138: Co-location is a tool and technique of:...
Question 139: A team has been tasked with designing a product to address a...
Question 140: At what stages of project should the identify Stakeholder pr...
Question 141: Which Knowledge Areas include processes from the Closing Pro...
Question 142: Requirements documentation, requirements management plan, an...
Question 143: A project manager is preparing a monthly status report for t...
Question 144: Which of the following is an output of Define Scope?...
Question 145: Which of the following includes how requirements activities ...
Question 146: In the Define Activities process, the schedule management pl...
Question 147: Which Control Quality tool is also known as an arrow diagram...
Question 148: The project manager is dividing the project scope into small...
Question 149: What type of planning is used where the work to be accomplis...
Question 150: Which document can help a project manager to leverage histor...
Question 151: Which statement is related to the project manager's sphere o...
Question 152: Deciding the phases of a project life cycle would be conside...
Question 153: Activity resource requirements and the resource breakdown st...
Question 154: A stakeholder expresses a need not known to the project mana...
Question 155: Responsible, accountable, consult and inform (RACI) is an ex...
Question 156: Resource calendars are included in the:...
Question 157: The project manager needs to obtain proposals on costs of su...
Question 158: When developing the project schedule, a project manager uses...
Question 159: What tools or techniques are necessary to create the project...
Question 160: With regard to a project manager's sphere of influence in a ...
Question 161: Given the following information, what is the schedule varian...
Question 162: Which is the correct formula for calculating expected activi...
Question 163: A program consists of four agile teams. Each team has a sepa...
Question 164: Which organizational process asset can make an impact on the...
Question 165: If a project manager effectively manages project knowledge, ...
Question 166: Which of the following is contained within the communication...
Question 167: A project has an EV of 100 workdays, an AC of 120 workdays, ...
Question 168: A project manager Is in the process of working with stakehol...
Question 169: Which is an output from Distribute Information?...
Question 170: The project management processes are usually presented as di...
Question 171: A project manager proactively meets with other project manag...
Question 172: A project manager is identifying the risks of a project. Whi...
Question 173: Which of the following are processes associated with Project...
Question 174: What describes the relationship between projects, programs, ...
Question 175: Which of the following answers includes an input, a techniqu...
Question 176: The project manager needs to manage a critical issue immedia...
Question 177: Which standard has interrelationships to other project manag...
Question 178: The component of the risk management plan that documents how...
Question 179: Which type of manager is assigned by the performing organiza...
Question 180: Which tools and techniques should a project manager use to m...
Question 181: The process of defining how the project scope will be valida...
Question 182: Which of the following is an output of the Perform Integrate...
Question 183: The group technique that enhances brainstorming with a votin...
Question 184: What is the purpose of an adaptive standup meeting?...
Question 185: Project deliverables that have been completed and checked fo...
Question 186: Work performance information and cost forecasts are outputs ...
Question 187: Control charts, flowcharting, histograms, Pareto charts, and...
Question 188: What charts and (igures should project managers use during t...
Question 189: During what project management process does the project mana...
Question 190: Which is the order of steps in the Procurement Management pr...
Question 191: Which of the following is used as input to prepare a cost ma...
Question 192: Outputs of the Control Communications process include:...
Question 193: A risk that arises as a direct result of implementing a risk...
Question 194: What is the function of a Project Management Office (PMO)?...
Question 195: The formal and informal interaction with others in an organi...
Question 196: Typical outcomes of a project include:...
Question 197: The process of identifying and documenting project roles, re...
Question 198: Which tool within the Perform Quality Control process identi...
Question 199: An input of the Control Schedule process is the:...
Question 200: Match the project manager's sphere of influence with the ass...
Question 201: (Exhibit) As the project takes place and some issues arose, ...
Question 202: In the last two iterations, a project team failed to deliver...
Question 203: What communications management process enables an effective ...
Question 204: Lessons learned documentation is gathered during which of th...
Question 205: Which of the following is used to classify stakeholders base...
Question 206: The total of the planned value (PV) is also known as:...
Question 207: Which type of contract is most commonly used by buying organ...
Question 208: What is the name of a graphic display of project team member...
Question 209: What tern describes an intentional activity to modify a nonc...
Question 210: Which basic quality tool explains a change in the dependent ...
Question 211: In a typical project, project managers spend most of their t...
Question 212: Which tools and techniques should a project manager use when...
Question 213: What is a key benefit of using virtual project teams?...
Question 214: The procurement requirements for a project include working w...
Question 215: For what project management process is work performance info...
Question 216: It's time to perform code review on a software project that ...
Question 217: Quality metrics are an output of which process?...
Question 218: Which behavior is a management trait?...
Question 219: How many Project Management Process Groups are there?...
Question 220: Which type of project management office (PMO) supplies templ...
Question 221: Product requirements specify a functionality that depends up...
Question 222: Which type of elaboration allows a project management team t...
Question 223: How can a project manager determine if the project activitie...
Question 224: Which of the following must be included in the risk register...
Question 225: Which Knowledge Area involves identifying the people, groups...
Question 226: How should a project manager plan communication for a projec...
Question 227: Which process involves developing an approximation of the mo...
Question 228: Which is an example of leveraging evolving trends and emergi...
Question 229: Plan Communications Management develops an approach and plan...
Question 230: Plan Risk Management is the process of defining how to:...
Question 231: Which defines the portion of work included in a contract for...
Question 232: Which Process Group includes the Manage Stakeholder Engageme...
Question 233: A project manager is assigned to a strategic project Senior ...
Question 234: Which action should the project manager take after the team ...
Question 235: When does the project team determine which dependencies are ...
Question 236: An executive sponsor wants to be briefed on how the product ...
Question 237: The iterative process of increasing the level of detail in a...
Question 238: What is the difference between the critical path and the cri...
Question 239: A project team of telecommuters located in three different t...
Question 240: Which of the following is an example of an organizational sy...
Question 241: Which of the following statements correctly characterizes pu...
Question 242: During which process of Project Cost Management does a proje...
Question 243: Which Plan Schedule Management tool or technique may involve...
Question 244: Conflict should be best addressed in which manner?...
Question 245: A project manager should document the escalation path for un...
Question 246: What is the primary benefit of meeting quality requirements?...
Question 247: When can pre-assignment of project team members occur?...
Question 248: In an interactive communication model, how is the sender ens...
Question 249: Which type of project life cycle uses an iteration plan?...
Question 250: Which tool or technique of Plan Quality involves comparing a...
Question 251: Which project manager competency is displayed through the kn...
Question 252: A project veers off track due to scope creep. The project ma...
Question 253: A project manager is working on an estimate. The project tea...
Question 254: The following is a network diagram for a project. (Exhibit) ...
Question 255: What does expert judgment provide as an input to the resourc...
Question 256: Which of the following change requests can bring expected fu...
Question 257: A project is at the closing stage. The project manager asks ...
Question 258: An intentional activity to modify a nonconforming product or...
Question 259: In an agile or adaptive environment. when should risk be mon...
Question 260: A project manager who communicates to the project team thoug...
Question 261: The project team is inspecting the completed project scope t...
Question 262: In the project charter process, which three of the following...
Question 263: Which of the following are an enterprise environmental facto...
Question 264: A project manager held a meeting and listed all team members...
Question 265: A Scrum team has a product backlog and a sprint backlog. Whi...
Question 266: What does leadership involve?
Question 267: What is the difference between verified and accepted deliver...
Question 268: Which tool or technique of the Define Activities process all...
Question 269: In one of the project meetings during a project execution, a...
Question 270: Which of the following events would result in a baseline upd...
Question 271: What tool or technique will establish expected behaviors for...
Question 272: In project management, a temporary project can be:...
Question 273: A regression line is used to estimate:...
Question 274: A project team is closing out a phase and updating the organ...
Question 275: Stakeholder satisfaction should be managed as a key project:...
Question 276: Which of the following is a tool or technique of the Define ...
Question 277: Which Process Group contains those processes performed to de...
Question 278: A project manager oversees a project in an adaptive environm...
Question 279: Which of the following consists of the detailed project scop...
Question 280: The Define Scope process is in which of the following Proces...
Question 281: A project manager at a publishing company decides to initiat...
Question 282: What risk response strategy involves removing high- risk sco...
Question 283: When planning communications management what input identifie...
Question 284: What is one of the main purposes of the project chatter?...
Question 285: A project manager Is addressing risks and potential concerns...
Question 286: The purpose of inspection in Perform Quality Control is to k...
Question 287: What organizational asset can influence the Plan Risk Manage...
Question 288: Which Control Stakeholder Engagement tool or technique allow...
Question 289: What three strategies are used to respond to threats?...
Question 290: Development of the benefits management plan occurs in which ...
Question 291: The scope of a project cannot be defined without some basic ...
Question 292: What is the purpose of the project schedule management....
Question 293: A software development team is pulling work from its backlog...
Question 294: Which process is included in the Project Integration Managem...
Question 295: A new project manager wishes to recommend creating a project...
Question 296: Which technique is commonly used for the Perform Quantitativ...
Question 297: Due to organizational changes, a new product owner joins a p...
Question 298: The risk shared between the buyer and seller is determined b...
Question 299: Which change request is an intentional activity that realign...
Question 300: A project has an estimated duration of 10 months with a tota...
Question 301: An adaptive project manager is migrating the company's new w...
Question 302: Which tool or technique is used to develop the human resourc...
Question 303: Projects can be divided into phases to provide better manage...
Question 304: A project manager has just completed several brainstorming s...
Question 305: The following is a network diagram for a project. (Exhibit) ...
Question 306: What are the formal and informal policies, procedures, and g...
Question 307: Which of the following types of a dependency determination i...
Question 308: After winning a large government contract, a company needs t...
Question 309: Considering a highly dynamic project environment, which appr...
Question 310: Project Stakeholder Management focuses on:...
Question 311: A projects purpose or justification, measurable project obje...
Question 312: The procurement process that documents agreements and relate...
Question 313: The process of identifying and documenting relationships amo...
Question 314: The process of aggregating the estimated costs of individual...
Question 315: What is the schedule performance index (SPI) if the planned ...
Question 316: Which index is the calculated projection of cost performance...
Question 317: The methodology that combines scope, schedule, and resource ...
Question 318: When alternative dispute resolution (ADR) is necessary, whic...
Question 319: Which type of analysis would be used for the Plan Quality pr...
Question 320: The technique of subdividing project deliverables into small...
Question 321: In which of the risk management processes is the processes i...
Question 322: A company must implement sales software because it is openin...
Question 323: At the end of the third iteration, the project team gathers ...
Question 324: Under which circumstances should multiple projects be groupe...
Question 325: Who determines which dependencies are mandatory during the S...
Question 326: What is the schedule performance index (SPI) using the follo...
Question 327: The project manager is working in an agile/adaptive environm...
Question 328: Analogous cost estimating relies on which of the following t...
Question 329: Which of these is true project integration management?...
Question 330: What is one of the objectives of Project Risk Management?...
Question 331: How should the project manager obtain the maximum engagement...
Question 332: A project using the agile/adaptive approach has reached the ...
Question 333: After Define Activities and Sequence Activities, the next pr...
Question 334: Directing another person to get from one point to another us...
Question 335: Which of the following is an input to the Perform Qualitativ...
Question 336: Plan Schedule Management is a process in which Knowledge Are...
Question 337: A project manager should communicate to stakeholders about r...
Question 338: A subject matter expert (SME) was recently assigned to a pro...
Question 339: Monte Carlo is which type of risk analysis technique?...
Question 340: A company is moving from a predictive to an adaptive approac...
Question 341: The risk response strategy in which the project team acts to...
Question 342: An input required in Define Scope is an organizational:...
Question 343: Which cost is associated with nonconformance?...
Question 344: Which action is included in the Control Costs process?...
Question 345: What is the first step in the Stakeholder Management process...
Question 346: Which can be used to determine whether a process is stable o...
Question 347: Project managers who lead by example and follow through on t...
Question 348: Sensitivity analysis is typically displayed as a/an:...
Question 349: Units of measure, level of precision, level of accuracy, con...
Question 350: Identifying major deliverables, deciding if adequate cost es...
Question 351: A project manager builds consensus and overcomes obstacles b...
Question 352: The project manager is working in the Resource Management pr...
Question 353: Given the following information. Activity A takes one week. ...
Question 354: Select two key benefits of the Control Procurements process...
Question 355: Which of the following documents allows the project manager ...
Question 356: A project manager should consider the impact of project........
Question 357: Definitions of probability and impact, revised stakeholder t...
Question 358: Which of the following projects is a quality candidate for a...
Question 359: Which of the following response strategies are appropriate f...
Question 360: Which of the following lists represents the outputs of the M...
Question 361: At the completion of a project, a report is prepared that de...
Question 362: The most appropriate project life cycle model for an environ...
Question 363: Which Project Management Process Group includes Collect Requ...
Question 364: The risk management team of a software project has decided t...
Question 365: Which of the following tasks is related to the perform quali...
Question 366: A project manager needs to tailor the Project Cost Managemen...
Question 367: A project was sent for early customer testing and the custom...
Question 368: The project manager is explaining to others the essential bu...
Question 369: A project team is working on relocating offices to another b...
Question 370: Which of the Perform Quality Assurance tools and techniques ...
Question 371: Organizational planning impacts projects by means of project...
Question 372: Which of the following is an enterprise environmental factor...
Question 373: Which is one of the determining factors used to calculate CP...
Question 374: When developing a schedule which tools and techniques should...
Question 375: What is an output of the plan resource management process...
Question 376: The application of knowledge, skills, tools, and techniques ...
Question 377: Which input will be used when tasked with developing the hum...
Question 378: In which process might a project manager use risk reassessme...
Question 379: The staffing management plan is part of the:...
Question 380: The Project Human Resource Management process that involves ...
Question 381: During the planning phase, a project manager must create a w...
Question 382: In which of the Risk Management processes is the project cha...
Question 383: Which is the Define Scope technique used to generate differe...
Question 384: Perform Integrated Change Control is the process of:...
Question 385: When executing a project, a recently hired subject matter ex...
Question 386: A tool and technique used in the Develop Project Charter pro...
Question 387: Which of the following is a group decision-making technique?...
Question 388: Which process determines the risks that may affect the proje...
Question 389: A project is in its final stages when a competitor releases ...
Question 390: Which Process Group contains the processes performed to comp...
Question 391: In an agile and adaptive project, which scope management ent...
Question 392: What is the total float of the critical path?...
Question 393: Completion of the product scope is measured against the prod...
Question 394: What is the discipline that focuses on the interdependences ...
Question 395: Sharing good practices introduced or implemented in similar ...
Question 396: What is the estimate at completion (EAC) if the budget at co...
Question 397: A tool or technique in Perform Quality Control that a projec...
Question 398: Project managers plan a key role performing integration on t...
Question 399: To which process is work performance information an input?...
Question 400: What is the most accurate rough order of magnitude (ROM)?...
Question 401: Calculate the Schedule Performance Index (SPI) based on the ...
Question 402: Which is an enterprise environmental factor?...
Question 403: Which statement describes the various purposes of project sc...
Question 404: What kind of skills should a project manager use when attemp...
Question 405: Which characteristics do effective project managers possess?...
Question 406: What type of reward can hurt team cohesiveness?...
Question 407: A tool and technique used during the Define Scope process is...
Question 408: According to the PMI Talent Triangle. leadership skills rela...
Question 409: A Project manager received a change request from a key stake...
Question 410: In a weak matrix, the project managers role is:...
Question 411: The Human Resource Management processes are:...
Question 412: The project manager is working with some functional managers...
Question 413: It you established a contingency reserve including time, mon...
Question 414: The definition of when and how often the risk management pro...
Question 415: The following is a network diagram for a project. (Exhibit) ...
Question 416: An output of the Direct and Manage Project Work process is:...
Question 417: Which of the following statements is true regarding project ...
Question 418: Which set of activities should a project manager use as part...
Question 419: When should quality planning be performed?...
Question 420: What is a tailoring consideration in Project Integration Man...
Question 421: Which Process Group and Knowledge Area include the Sequence ...
Question 422: Stakeholder communication requirements should be included as...
Question 423: Which earned value management (EVM) metric is a measure of t...
Question 424: Which quality management and control tool is useful in visua...
Question 425: Enterprise environmental factors are an input to which proce...
Question 426: What is the project manager's responsibility in Project Inte...
Question 427: Which of the following is an output of the Monitor and Contr...
Question 428: Which of the following is an example of tacit knowledge...
Question 429: Which of the following reduces the probability of potential ...
Question 430: When can we say that a project is completed?...
Question 431: What is the recommended approach for handling risk in a high...
Question 432: What is the process of ensuring that project resources are a...
Question 433: Howls program success measured?...
Question 434: Match each tool or technique with its corresponding Project ...
Question 435: Which of the following tools or techniques is used for Estim...
Question 436: The Plan Stakeholder Management process belongs to which Pro...
Question 437: A project manager is appointed full-time to a project and is...
Question 438: Which process is responsible for monitoring the status of th...
Question 439: During which process group is the quality policy determined?...
Question 440: Who defines the scope of the product...
Question 441: Risk categorization is a tool or technique used in which pro...
Question 442: A new business analyst has joined the team in the middle of ...
Question 443: Which of the following factors within a company cloud trigge...
Question 444: The following chart contains information about the tasks in ...
Question 445: Which of the following is an output of the Distribute Inform...
Question 446: Perform Quantitative Risk Analysis focuses on:...
Question 447: When establishing a contingency reserve, including time, mon...
Question 448: A project manager needs to determine the schedule variance (...
Question 449: If you are using an Ishikawa diagram to determine the root c...
Question 450: Which tool or technique can a project manager use to select ...
Question 451: A project management office manages a number of aspects incl...
Question 452: Which illustrates the connection between work that needs to ...
Question 453: A logical relationship in which a successor activity cannot ...
Question 454: Tools and techniques used for Plan Communications include th...
Question 455: What can the cost management plan establish?...
Question 456: What is a tool to improve team performance?...
Question 457: A project is in progress and about to move to a different ph...
Question 458: Which process occurs within the Monitoring and Controlling P...
Question 459: An input to the Identify Stakeholders process is:...
Question 460: Which is a method of prototyping that creates a functioning ...
Question 461: What are the key tools for managing project knowledge?...
Question 462: Risk responses reflect an organization's perceived balance b...
Question 463: Which of the following is example of communication tools and...
Question 464: Which process involves subdividing project deliverables and ...
Question 465: In which phase of team building activities do team members b...
Question 466: What is an example of a technical project management skill?...
Question 467: Which is an input to the Verify Scope process?...
Question 468: A project manager has created an issue log to document issue...
Question 469: What are the project management processes associated with pr...
Question 470: The scope management plan is a subsidiary of which project d...
Question 471: Which enterprise environmental factors may influence Plan Sc...
Question 472: Which baselines make up the performance measurement baseline...
Question 473: What are the inputs of the Estimate Costs process?...
Question 474: Which of the following set of items belongs to the communica...
Question 475: The process of estimating the type and quantity of material,...
Question 476: An input to the Plan Cost Management process is:...
Question 477: Two resources are performing a peer review of an artifact. W...
Question 478: The project manager notes that stakeholders are aware of the...
Question 479: A key project team member complains about being left out of ...
Question 480: What is the key benefit of the Monitor Stakeholder Engagemen...
Question 481: Which term describes an assessment of correctness?...
Question 482: The Agile principle "welcome changing requirement, even late...
Question 483: What is a characteristic of the relationship among projects,...
Question 484: While executing a building construction project, the supplie...
Question 485: An input to Close Project or Phase is:...
Question 486: In which sphere of influence is the project manager demonstr...
Question 487: Which of the following is an output of the Define Activities...
Question 488: Which of these is true of project integration management?...
Question 489: The process of identifying specific actions to be performed ...
Question 490: At the end of the project, what will be the value of SV?...
Question 491: When a permitting agency takes longer than planned to issue ...
Question 492: Which of the following is an input to the Direct and Manage ...
Question 493: Match the method for categorizing stakeholders with its corr...
Question 494: What is the definition of Direct and Manage Project Executio...
Question 495: A project manager is performing a specific process and has.....
Question 496: The review of a sellers progress toward achieving the goals ...
Question 497: An output of the Create WBS process is:...
Question 498: Tailoring considerations for project scope management may in...
Question 499: What process is used to identify quality requirements and/or...
Question 500: The links between the processes in the Process Groups are of...
Question 501: Which Process Group typically consumes the bulk of a project...
Question 502: Which output of Project Cost Management consists of quantita...
Question 503: During the execution phase of a multibillion-dollar project,...
Question 504: Which project life cycle follows a plan reviewed and approve...