You want to change the configuration of an active stand-alone DB system. The DB system is configured as the target of a channel, and the channel is currently active.
Which sequence of steps must you perform?
Correct Answer: D
To change the configuration of an active stand-alone DB system that is configured as the target of a channel, and the channel is currently active, you must:
D:Stop the channel, edit the DB system, change the configuration, and start the channel: This sequence ensures that no data inconsistency or replication issues occur while the configuration changes are being applied.