How are L0 and L1 resources coordinated in case of a failure in an MRN?
Correct Answer: A
Explanation Coordination of L0 and L1 resources in case of a failure in an MRN is achieved by setting the color constraints. Color constraints are used to specify which wavelengths or timeslots can be used by a given LSP request. By setting the color constraints, the NFM-T can ensure that the L0 and L1 resources are compatible and consistent across the network. For example, if an L0 LSP request requires a specific wavelength, the NFM-T can set the color constraint to match that wavelength and assign it to the L0 LSP. Similarly, if an L1 LSP request requires a specific timeslot, the NFM-T can set the color constraint to match that timeslot and assign it to the L1 LSP. This way, the coordination of L0 and L1 resources is achieved by ensuring that the same color is used by both layers. References : Nokia GMPLS-controlled Optical Networks Course | Nokia, 3. GMPLS - Nokia