<< Prev Question Next Question >>

Question 252/338

The head of a business operations department asks to review the entire IT risk register. Which of the following would be the risk manager s BEST approach to this request before sharing the register?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (338q)
Question 1: The FIRST task when developing a business continuity plan sh...
Question 2: Which of the following is the MAIN reason for analyzing risk...
Question 3: An organization is conducting a review of emerging risk. Whi...
Question 4: Which of the following BEST enables an organization to deter...
Question 5: The PRIMARY reason a risk practitioner would be interested i...
Question 6: Which of the following should be a risk practitioner's MOST ...
Question 7: Which of the following contributes MOST to the effective imp...
Question 8: Which of the following is of GREATEST concern when uncontrol...
Question 9: Which of the following BEST provides an early warning that n...
Question 10: Which of the following would BEST help to ensure that identi...
Question 11: An upward trend in which of the following metrics should be ...
Question 12: A risk practitioner is preparing a report to communicate cha...
Question 13: Which type of indicators should be developed to measure the ...
Question 14: An organization outsources the processing of us payroll data...
Question 15: Which of the following BEST supports the communication of ri...
Question 16: Which of the following would require updates to an organizat...
Question 17: Which of the following is a risk practitioner's BEST recomme...
Question 18: What is the PRIMARY purpose of a business impact analysis (B...
Question 19: Which of the following is the GREATEST concern when an organ...
Question 20: Which of the following is the BEST way for a risk practition...
Question 21: Which of the following is a KEY responsibility of the second...
Question 22: Which of the following is the MOST comprehensive resource fo...
Question 23: The MOST important objective of information security control...
Question 24: Which of the following would prompt changes in key risk indi...
Question 25: Risk mitigation procedures should include:...
Question 26: Which of the following would be the result of a significant ...
Question 27: Legal and regulatory risk associated with business conducted...
Question 28: Which of the following BEST measures the impact of business ...
Question 29: Which of the following statements BEST describes risk appeti...
Question 30: Which of the following is MOST important when considering ri...
Question 31: When of the following is the MOST significant exposure when ...
Question 32: During the control evaluation phase of a risk assessment, it...
Question 33: An IT risk threat analysis is BEST used to establish...
Question 34: Which of the following BEST informs decision-makers about th...
Question 35: A company has recently acquired a customer relationship mana...
Question 36: An organization's HR department has implemented a policy req...
Question 37: When updating the risk register after a risk assessment, whi...
Question 38: When reviewing management's IT control self-assessments, a r...
Question 39: Which of the following is the MOST important data attribute ...
Question 40: Which of the following is the BEST recommendation to senior ...
Question 41: Which of the following would BEST facilitate the implementat...
Question 42: After undertaking a risk assessment of a production system, ...
Question 43: Improvements in the design and implementation of a control w...
Question 44: Which of the following is a risk practitioner's BEST course ...
Question 45: Which of the following is MOST important for a risk practiti...
Question 46: Which of the following provides The BEST information when de...
Question 47: An organization is concerned that its employees may be unint...
Question 48: A chief information officer (CIO) has identified risk associ...
Question 49: Which of the following is MOST important to the successful d...
Question 50: Which of the following BEST indicates effective information ...
Question 51: Which of the following is the MOST effective way to integrat...
Question 52: A bank has outsourced its statement printing function to an ...
Question 53: Which of the following is the BEST indicator of the effectiv...
Question 54: From a risk management perspective, which of the following i...
Question 55: Vulnerabilities have been detected on an organization's syst...
Question 56: Which of the following is MOST important information to revi...
Question 57: Which of the following is the BEST evidence that a user acco...
Question 58: What is the MOST important consideration when aligning IT ri...
Question 59: An organization has recently been experiencing frequent data...
Question 60: A risk practitioner is organizing risk awareness training fo...
Question 61: Which of the following is the BEST indication of an improved...
Question 62: Which of the following scenarios presents the GREATEST risk ...
Question 63: Which of the following is the MOST important topic to cover ...
Question 64: Which of the following resources is MOST helpful when creati...
Question 65: Which of the following will BEST mitigate the risk associate...
Question 66: A systems interruption has been traced to a personal USB dev...
Question 67: While conducting an organization-wide risk assessment, it is...
Question 68: A recent internal risk review reveals the majority of core I...
Question 69: Which of the following practices would be MOST effective in ...
Question 70: Which of the following is a drawback in the use of quantitat...
Question 71: Which of the following risk register updates is MOST importa...
Question 72: An organization has used generic risk scenarios to populate ...
Question 73: Which of the following is the BEST way to determine the ongo...
Question 74: Which of the following controls would BEST reduce the likeli...
Question 75: Which of the following would be the BEST way to help ensure ...
Question 76: Which of the following is the MOST important consideration w...
Question 77: Which of the following is the MOST important consideration f...
Question 78: Winch of the following is the BEST evidence of an effective ...
Question 79: An organization has allowed its cyber risk insurance to laps...
Question 80: A business unit has decided to accept the risk of implementi...
Question 81: Who is PRIMARILY accountable for risk treatment decisions?...
Question 82: Which of the following provides the MOST helpful information...
Question 83: Which of the following is the FIRST step in managing the ris...
Question 84: Which of the following is the MOST important information to ...
Question 85: During the risk assessment of an organization that processes...
Question 86: The MOST important characteristic of an organization s polic...
Question 87: A PRIMARY function of the risk register is to provide suppor...
Question 88: Within the three lines of defense model, the accountability ...
Question 89: A global organization is considering the acquisition of a co...
Question 90: An organization has provided legal text explaining the right...
Question 91: Which of the following BEST represents a critical threshold ...
Question 92: Which of the following is the MOST effective way to integrat...
Question 93: Which of the following BEST facilitates the mitigation of id...
Question 94: The MAIN goal of the risk analysis process is to determine t...
Question 95: Which of the following should be included in a risk scenario...
Question 96: Which of the following BEST indicates that additional or imp...
Question 97: Which of the following should be a risk practitioner's PRIMA...
Question 98: The risk associated with an asset after controls are applied...
Question 99: After a risk has been identified, who is in the BEST positio...
Question 100: An IT department has provided a shared drive for personnel t...
Question 101: Which of the following is MOST important for mitigating ethi...
Question 102: A contract associated with a cloud service provider MUST inc...
Question 103: Which of the following is the STRONGEST indication an organi...
Question 104: An organization is measuring the effectiveness of its change...
Question 105: Which of the following BEST indicates the condition of a ris...
Question 106: During an IT department reorganization, the manager of a ris...
Question 107: In response to the threat of ransomware, an organization has...
Question 108: Which of the following is MOST useful when communicating ris...
Question 109: Which of the following is the MOST important consideration w...
Question 110: Which of the following is the MOST important data source for...
Question 111: The PRIMARY reason for establishing various Threshold levels...
Question 112: Which of the following practices BEST mitigates risk related...
Question 113: Which of the following is MOST important to the effectivenes...
Question 114: A rule-based data loss prevention {DLP) tool has recently be...
Question 115: Which of the following is MOST effective against external th...
Question 116: Which of the following should be of GREATEST concern to a ri...
Question 117: Which of the following BEST mitigates the risk of violating ...
Question 118: The acceptance of control costs that exceed risk exposure MO...
Question 119: Which of the following indicates an organization follows IT ...
Question 120: Which of the following aspects of an IT risk and control sel...
Question 121: What should a risk practitioner do FIRST upon learning a ris...
Question 122: The risk associated with an asset before controls are applie...
Question 123: Which of the following is the BEST indication of the effecti...
Question 124: Which of the following is MOST important to understand when ...
Question 125: The PRIMARY reason for prioritizing risk scenarios is to:...
Question 126: As pan of business continuity planning, which of the followi...
Question 127: When of the following 15 MOST important when developing a bu...
Question 128: Which of the following is the BEST method to identify unnece...
Question 129: During an internal IT audit, an active network account belon...
Question 130: The design of procedures to prevent fraudulent transactions ...
Question 131: Which of the following issues found during the review of a n...
Question 132: Which of the following is the BEST course of action to help ...
Question 133: Accountability for a particular risk is BEST represented in ...
Question 134: Which of the following would BEST mitigate the ongoing risk ...
Question 135: Which of the following methods would BEST contribute to iden...
Question 136: A department allows multiple users to perform maintenance on...
Question 137: Which of the following stakeholders are typically included a...
Question 138: An internally developed payroll application leverages Platfo...
Question 139: What should be the PRIMARY driver for periodically reviewing...
Question 140: An external security audit has reported multiple findings re...
Question 141: it was determined that replication of a critical database us...
Question 142: Which of the following is MOST helpful in defining an early-...
Question 143: In which of the following system development life cycle (SDL...
Question 144: Which of the following is the MOST important benefit of key ...
Question 145: Which element of an organization's risk register is MOST imp...
Question 146: Controls should be defined during the design phase of system...
Question 147: Which of the following is the GREATEST benefit to an organiz...
Question 148: From a business perspective, which of the following is the M...
Question 149: Which of the following should be the MAIN consideration when...
Question 150: Performing a background check on a new employee candidate be...
Question 151: Malware has recently affected an organization. The MOST effe...
Question 152: An audit reveals that there are changes in the environment t...
Question 153: An organization has outsourced a critical process involving ...
Question 154: Which of the following is MOST important to ensure when cont...
Question 155: An organization has completed a risk assessment of one of it...
Question 156: Which of the following is the BEST approach for performing a...
Question 157: To reduce the risk introduced when conducting penetration te...
Question 158: Which of the following BEST facilitates the development of e...
Question 159: The PRIMARY basis for selecting a security control is:...
Question 160: A new policy has been published to forbid copying of data on...
Question 161: An organization recently received an independent security au...
Question 162: Which of The following should be the FIRST step when a compa...
Question 163: Several newly identified risk scenarios are being integrated...
Question 164: Which of the following is the BEST way to detect zero-day ma...
Question 165: The BEST way to demonstrate alignment of the risk profile wi...
Question 166: Which of the following is the MOST useful indicator to measu...
Question 167: Which of the following is the MOST important input when deve...
Question 168: When developing risk treatment alternatives for a Business c...
Question 169: An organization has implemented a system capable of comprehe...
Question 170: Which of the following is the MOST critical element to maxim...
Question 171: Which of the following is the BEST key performance indicator...
Question 172: An organization has opened a subsidiary in a foreign country...
Question 173: Which of the following is the FIRST step in risk assessment?...
Question 174: Which of the following is MOST important to enable well-info...
Question 175: Which of the following is MOST important when developing ris...
Question 176: Which of the following is the MOST important factor when dec...
Question 177: Which of the following is the BEST indication that key risk ...
Question 178: IT stakeholders have asked a risk practitioner for IT risk p...
Question 179: To communicate the risk associated with IT in business terms...
Question 180: A management team is on an aggressive mission to launch a ne...
Question 181: The MOST essential content to include in an IT risk awarenes...
Question 182: Which of the following is MOST important to include in a Sof...
Question 183: Which of the following is the BEST approach for determining ...
Question 184: Which of the following will BEST support management repottin...
Question 185: Which of the following is the FIRST step in managing the sec...
Question 186: Which of the following is the PRIMARY reason to update a ris...
Question 187: A risk practitioner is organizing a training session lo comm...
Question 188: An organization has decided to use an external auditor to re...
Question 189: Which of the following is a KEY consideration for a risk pra...
Question 190: A risk assessment indicates the residual risk associated wit...
Question 191: The effectiveness of a control has decreased. What is the MO...
Question 192: An organization's IT infrastructure is running end-of-life s...
Question 193: Senior management has asked a risk practitioner to develop t...
Question 194: A payroll manager discovers that fields in certain payroll r...
Question 195: When of the following standard operating procedure (SOP) sta...
Question 196: A financial institution has identified high risk of fraud in...
Question 197: Which of the following risk management practices BEST facili...
Question 198: Which of the following would be MOST helpful when estimating...
Question 199: An organization has initiated a project to implement an IT r...
Question 200: Which of the following MUST be assessed before considering r...
Question 201: An organization is planning to outsource its payroll functio...
Question 202: Which of the following is the PRIMARY role of the board of d...
Question 203: A global organization is planning to collect customer behavi...
Question 204: Which of the following is an IT business owner's BEST course...
Question 205: An organization has detected unauthorized logins to its clie...
Question 206: Which of the following is the MOST important requirement for...
Question 207: Employees are repeatedly seen holding the door open for othe...
Question 208: During a risk treatment plan review, a risk practitioner fin...
Question 209: An organization wants to grant remote access to a system con...
Question 210: The PRIMARY benefit of conducting continuous monitoring of a...
Question 211: Following a significant change to a business process, a risk...
Question 212: A risk practitioner shares the results of a vulnerability as...
Question 213: Which of the following BEST helps to balance the costs and b...
Question 214: During a risk assessment, the risk practitioner finds a new ...
Question 215: A risk heat map is MOST commonly used as part of an IT risk ...
Question 216: Who should have the authority to approve an exception to a c...
Question 217: A new regulator/ requirement imposes severe fines for data l...
Question 218: A risk practitioner has been asked to advise management on d...
Question 219: An employee lost a personal mobile device that may contain s...
Question 220: A control for mitigating risk in a key business area cannot ...
Question 221: A change management process has recently been updated with n...
Question 222: Which of the following is the GREATEST risk associated with ...
Question 223: Who should be responsible (of evaluating the residual risk a...
Question 224: Which of the following would be MOST helpful when communicat...
Question 225: Which of the following is MOST commonly compared against the...
Question 226: When reviewing a business continuity plan (BCP). which of th...
Question 227: Calculation of the recovery time objective (RTO) is necessar...
Question 228: Who should be accountable for ensuring effective cybersecuri...
Question 229: Which of the following is a KEY outcome of risk ownership?...
Question 230: An organization must make a choice among multiple options to...
Question 231: Which of the following is MOST important to sustainable deve...
Question 232: A risk practitioner observes that the fraud detection contro...
Question 233: Which of the following BEST enables the identification of tr...
Question 234: Which of the following is the MOST important consideration w...
Question 235: Which of the following is the GREATEST risk associated with ...
Question 236: Which of the following would BEST ensure that identified ris...
Question 237: Which of the following is MOST helpful in determining the ef...
Question 238: When determining which control deficiencies are most signifi...
Question 239: Which of the following is the MOST important key performance...
Question 240: What is MOST important for the risk practitioner to understa...
Question 241: An IT organization is replacing the customer relationship ma...
Question 242: Which of the following is the PRIMARY objective of providing...
Question 243: Which of the following is the MOST important outcome of revi...
Question 244: Which of the following is MOST influential when management m...
Question 245: Which of the following is the BEST course of action when ris...
Question 246: Which of the following MUST be updated to maintain an IT ris...
Question 247: A risk practitioner is developing a set of bottom-up IT risk...
Question 248: Which of the following attributes of a key risk indicator (K...
Question 249: Which of the following should be the PRIMARY consideration w...
Question 250: All business units within an organization have the same risk...
Question 251: Which of the following is MOST critical when designing contr...
Question 252: The head of a business operations department asks to review ...
Question 253: Which of the following would be a risk practitioner's BEST r...
Question 254: The PRIMARY reason for periodic penetration testing of Inter...
Question 255: Which of the following would be MOST helpful to a risk owner...
Question 256: Which of the following is MOST helpful in verifying that the...
Question 257: The PRIMARY benefit of classifying information assets is tha...
Question 258: A control owner responsible for the access management proces...
Question 259: Which of the following is the BEST way to determine software...
Question 260: Which stakeholders are PRIMARILY responsible for determining...
Question 261: In an organization dependent on data analytics to drive deci...
Question 262: Which of the following would be the GREATEST challenge when ...
Question 263: To help ensure all applicable risk scenarios are incorporate...
Question 264: Senior management has asked the risk practitioner for the ov...
Question 265: During the initial risk identification process for a busines...
Question 266: An organization is considering outsourcing user administrati...
Question 267: An organization that has been the subject of multiple social...
Question 268: A risk practitioner has received an updated enterprise risk ...
Question 269: Which of the following is the MOST effective way to mitigate...
Question 270: Which of the following BEST reduces the probability of lapto...
Question 271: What is the PRIMARY reason an organization should include ba...
Question 272: The GREATEST benefit of including low-probability, high-impa...
Question 273: Which of the following is the PRIMARY reason for an organiza...
Question 274: An organization has been notified that a disgruntled, termin...
Question 275: A risk practitioner identifies a database application that h...
Question 276: Which of the following is the BEST method to ensure a termin...
Question 277: The MAIN purpose of conducting a control self-assessment (CS...
Question 278: An organization has raised the risk appetite for technology ...
Question 279: Which of the following is the BEST method for assessing cont...
Question 280: Which of the following is a PRIMARY benefit of engaging the ...
Question 281: The BEST way to justify the risk mitigation actions recommen...
Question 282: A risk practitioner is assisting with the preparation of a r...
Question 283: Which of the following should be initiated when a high numbe...
Question 284: Which of the following will provide the BEST measure of comp...
Question 285: The BEST way to obtain senior management support for investm...
Question 286: To implement the MOST effective monitoring of key risk indic...
Question 287: Which of the following is the FIRST step when conducting a b...
Question 288: When evaluating enterprise IT risk management it is MOST imp...
Question 289: Which of the following should be the risk practitioner s FIR...
Question 290: Which of the following is the PRIMARY factor in determining ...
Question 291: Which of the following is the BEST evidence that risk manage...
Question 292: During implementation of an intrusion detection system (IDS)...
Question 293: A risk owner should be the person accountable for:...
Question 294: A service provider is managing a client's servers. During an...
Question 295: Which of the following would present the GREATEST challenge ...
Question 296: The BEST key performance indicator (KPI) to measure the effe...
Question 297: Which of the following will BEST help an organization evalua...
Question 298: When reporting risk assessment results to senior management,...
Question 299: Which of the following should be the PRIMARY objective of a ...
Question 300: Which of the following is the MAIN benefit of involving stak...
Question 301: The MAIN purpose of having a documented risk profile is to:...
Question 302: Which of the following should management consider when selec...
Question 303: Which of the following BEST helps to identify significant ev...
Question 304: Which of the following is the PRIMARY role of a data custodi...
Question 305: Upon learning that the number of failed back-up attempts con...
Question 306: When reviewing a risk response strategy, senior management's...
Question 307: A risk practitioner has identified that the organization's s...
Question 308: Which of the following will BEST help mitigate the risk asso...
Question 309: After the implementation of internal of Things (IoT) devices...
Question 310: A third-party vendor has offered to perform user access prov...
Question 311: The PRIMARY benefit associated with key risk indicators (KRl...
Question 312: An organization learns of a new ransomware attack affecting ...
Question 313: IT disaster recovery point objectives (RPOs) should be based...
Question 314: When of the following is the BEST key control indicator (KCI...
Question 315: Which of the following would be a weakness in procedures for...
Question 316: The PRIMARY objective for requiring an independent review of...
Question 317: Which of the following is a detective control?...
Question 318: An organization is considering modifying its system to enabl...
Question 319: Which of the following is the GREATEST benefit of analyzing ...
Question 320: An organization has completed a project to implement encrypt...
Question 321: Which of the following is the BEST indicator of an effective...
Question 322: When performing a risk assessment of a new service to suppor...
Question 323: The following is the snapshot of a recently approved IT risk...
Question 324: Which of the following would BEST facilitate the implementat...
Question 325: Which of the following provides the MOST important informati...
Question 326: Which of the following is performed after a risk assessment ...
Question 327: The PRIMARY goal of conducting a business impact analysis (B...
Question 328: Who is BEST suited to determine whether a new control proper...
Question 329: A bank wants to send a critical payment order via email to o...
Question 330: For no apparent reason, the time required to complete daily ...
Question 331: Which of the following approaches would BEST help to identif...
Question 332: Which of the following should be the PRIMARY recipient of re...
Question 333: Which of the following should be an element of the risk appe...
Question 334: Which of the following is the MOST important consideration w...
Question 335: Which of the following BEST describes the role of the IT ris...
Question 336: Which of the following would be MOST beneficial as a key ris...
Question 337: Which of the following is the PRIMARY reason to establish th...
Question 338: Which of the following would BEST enable mitigation of newly...