Question 160/191

Consideration of construction, operation and maintenance costs before data center construction is an economic principle in project planning and design.

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (191q)
Question 1: Huawei's hyper-converged storage adopts the distributed hash...
Question 2: In the SmartVirtualzation feature, eDevlun corresponds to ex...
Question 3: Which of the following is wrong in the description of the fi...
Question 4: The safes of all storage arrays have the function of storing...
Question 5: Which of the following RAID technologies need to calculate p...
Question 6: The source end is a third-party device, and the destination ...
Question 7: Log in to the Huawei OceanStor hybrid flash storage CL windo...
Question 8: When all BBUs of the storage controller are damaged, the con...
Question 9: The backup back-end capacity is determined by the initial ca...
Question 10: The controller of the Huawei hybrid all-flash memory fails, ...
Question 11: Huawei OceanStor full-flash storage system supports IP drift...
Question 12: For various storage product portfolios, Huawei has launched ...
Question 13: An enterprise plans to upgrade the storage system and use Hu...
Question 14: An enterprise plans to build three centers in two places on ...
Question 15: Which of the following statements about the dry CIFS are cor...
Question 16: Company A purchases Huawei data protection all-in-one applia...
Question 17: A company purchased a set of Huawei hybrid flash storage equ...
Question 18: In the CLI command "change storage, pool relocation speed re...
Question 19: Before the cloned file system of Huawei OceanStor hybrid fla...
Question 20: To ensure data reliability, an enterprise establishes a remo...
Question 21: Which of the following descriptions are correct about Huawei...
Question 22: In order to improve the reliability of its important busines...
Question 23: Which level of data replication is the asynchronous remote r...
Question 24: Huawei's hybrid flash storage uses intelligent classificatio...
Question 25: In general, which of the following migration scenarios is th...
Question 26: A company has deployed a set of old storage for data. Due to...
Question 27: Which of the following statements about RTO recovery time ob...
Question 28: A bank purchased a set of Huawei all-flash storage to run th...
Question 29: In the CIFS share migration scheme, if there is local user g...
Question 30: smartqos is based on the I/O ( ) scheduling technology and f...
Question 31: M Enterprise uses Huawei data protection all-in-one machine ...
Question 32: Internet company A uses Huawei's hyper-converged storage to ...
Question 33: In Huawei all-flash storage, the core of the ( ) technology ...
Question 34: The fully balanced (Active-Active) architecture of Huawei's ...
Question 35: After employee A of a company logs in to the storage device ...
Question 36: The MTTR indicator is used to describe the average continuou...
Question 37: Enterprises plan to purchase storage devices that can meet d...
Question 38: Under what circumstances can distributed storage not cause r...
Question 39: A multinational enterprise has a huge business, and customer...
Question 40: An enterprise has applications such as key performance appli...
Question 41: When using advanced backup, the base volume periodically gen...
Question 42: Which of the following statements about RAID 2.0 is correct?...
Question 43: An engineer needs to perform a snapshot rollback operation t...
Question 44: Which of the following drivers is used when Huawei distribut...
Question 45: In Huawei OceanStor hybrid flash storage, data, logs, and mo...
Question 46: The customer F plans to purchase Huawei data protection all-...
Question 47: To meet service development requirements, the enterprise pla...
Question 48: Due to the needs of business development, an enterprise plan...
Question 49: An engineer logs in to the storage device as an administrato...
Question 50: In order to verify that the data from the slave lun is consi...
Question 51: After the remote replication configuration is complete, the ...
Question 52: Which of the following is the upgrade method for the control...
Question 53: In which of the following scenarios will OceanStor 9000 not ...
Question 54: Huawei Scale-Out File Storage is a scale-out file storage sy...
Question 55: . The iSCSI protocol is a SCSI instruction set that runs on ...
Question 56: A company's data center deploys 2 sets of Huawei all-flash s...
Question 57: The customer wishes to deploy a backup system to protect raw...
Question 58: A customer has 1100GB of data, of which the backup window is...
Question 59: Engineers can plan subnets of different sizes by changing th...
Question 60: A TV station plans to use Huawei OceanStor 900 products as t...
Question 61: The customer's business is very important and has a large am...
Question 62: In Huawei storage systems, the storage ( ) tool can pool sto...
Question 63: In the cluster multi-path networking configuration, which of...
Question 64: Which of the following descriptions about the InfoStamper fe...
Question 65: The heterogeneous virtualization feature is used for data mi...
Question 66: In order to accurately understand the operating status of th...
Question 67: Which of the following descriptions will not cause value-add...
Question 68: Which of the following storage migration technologies can on...
Question 69: Regarding the file deduplication and compression feature of ...
Question 70: A customer's Huawei OceanStor hybrid flash storage array has...
Question 71: Currently, there are more and more demands for centralized s...
Question 72: Which of the following statements are correct about performa...
Question 73: Minicomputer migration service, which layers does Huawei mai...
Question 74: When creating a LUN on Huawei Oceanstor hybrid flash storage...
Question 75: Which statement is correct regarding the prefetching strateg...
Question 76: When planning the backup capacity of storage, which factor d...
Question 77: Fusionstorage block storage supports large-scale expansion a...
Question 78: Which of the following statements are correct regarding the ...
Question 79: When configuring the protection level of the Huawei OceanSto...
Question 80: When the OceanStor 9000 storage system is deployed, the node...
Question 81: Enable the object WORM function in Huawei distributed storag...
Question 82: The asynchronous remote replication of Huawei OceanStor stor...
Question 83: RTO refers to the maximum ______ required to recover data in...
Question 84: Which of the following scenarios does NFS not support?...
Question 85: The peak write bandwidth of an application is 10MB/s, the av...
Question 86: If the two sites to be migrated are far apart, and the netwo...
Question 87: All-flash storage RAID2.0, CKG is divided into ( ), which is...
Question 88: ( ) using the First Burst Enabled function of the SCSI proto...
Question 89: During the processing of Huawei's distributed storage block ...
Question 90: Bank M plans to build a remote disaster recovery center. The...
Question 91: When building a disaster recovery system, which of the follo...
Question 92: A snapshot copy is a technique for backing up the moment of ...
Question 93: When BCManager creates a protection group to set protection ...
Question 94: If OceanStor hybrid flash memory is used at the same time, w...
Question 95: Windows supports MBR and GPT two disk partition modes. For M...
Question 96: Which of the following combinations is recommended for the c...
Question 97: In OceanStor 9000, when using the InfoTier feature to migrat...
Question 98: Compared with traditional RAID, what are the characteristics...
Question 99: Before implementing the BCManager active/standby disaster re...
Question 100: HyperMetro is an active-active solution, which achieves the ...
Question 101: A TV station plans to purchase Huawei hybrid flash storage d...
Question 102: In an Internet company's storage system, two services, A and...
Question 103: Engineer C maps the storage to the file server for saving va...
Question 104: When the alarm information can be collected normally, the al...
Question 105: Which of the following statements about the Thin LUN and Thi...
Question 106: (Drag and drop) According to the Huawei backup solution desi...
Question 107: A company has database applications, OLTP applications, mail...
Question 108: In Huawei OceanStor hybrid flash storage, which of the follo...
Question 109: In Huawei's hybrid flash storage device, _______ technology ...
Question 110: The FusionStorage software architecture can be divided into ...
Question 111: Which of the following is the correct understanding of FTP p...
Question 112: Which of the following remote replication methods can the hy...
Question 113: M Company plans to build a remote disaster recovery center w...
Question 114: A company has a set of business systems that it plans to dep...
Question 115: InfoReplicator supports copying the basic attributes, extend...
Question 116: A company plans to perform data protection through remote re...
Question 117: Bank A purchased Huawei all-flash storage to ensure that its...
Question 118: The networking switches in Huawei OceanStor Pacific series s...
Question 119: Windows supports two disk partition modes, MBR and GPT. For ...
Question 120: A TV station uses Huawei hybrid flash memory storage devices...
Question 121: To prevent Hyper CDP from taking up too much storage space, ...
Question 122: After the OceanStor 9000 is deployed, it will automatically ...
Question 123: ( ) deduplication means that data is divided into blocks of ...
Question 124: A securities company, in order to ensure business continuity...
Question 125: In an AD domain environment, if the ACL carried by the sourc...
Question 126: An employee of a company, Xiao Wang, performed the following...
Question 127: When Huawei distributed storage block service, which of the ...
Question 128: The customer's production environment has high server perfor...
Question 129: The research phase of backup plan mainly includes, project b...
Question 130: Which of the following binding modes is recommended for the ...
Question 131: Which of the following options are factors that affect the p...
Question 132: The fault recovery of Huawei's active and standby disaster r...
Question 133: Which of the following statements about Thin LUNs is true? (...
Question 134: The SmartMigration feature of storage will be used in Huawei...
Question 135: In the HyperMetr feature, the local storage device, the remo...
Question 136: Bank A uses Huawei all-flash storage to carry its key busine...
Question 137: A company has purchased a new batch of mainframes and storag...
Question 138: A bank builds two active-active data centers to carry Intern...
Question 139: Huawei OceanStor Pacific series storage provides unstructure...
Question 140: Huawei hyperconvergence has the function of adaptive global ...
Question 141: RAID2.0 has the natural advantage of supporting SmartTier, w...
Question 142: Huawei's all-flash storage system software adopts the Symmet...
Question 143: LLD is based on the determined target network architecture, ...
Question 144: Regarding the FRU replacement tool, which of the following s...
Question 145: What are the characteristics of storage based on the heterog...
Question 146: The active architecture of Huawei's mass storage system ensu...
Question 147: A certain storage project needs to achieve 50,000 ICOPS perf...
Question 148: The ________ system refers to the establishment of multiple ...
Question 149: Which descriptions are correct about the file system remote ...
Question 150: A company plans to deploy a new business system due to busin...
Question 151: BCMangereReplication software implements disaster recovery t...
Question 152: When HyperMetro of block service is used in Huawei's distrib...
Question 153: Which technology in the active-active disaster recovery solu...
Question 154: In the Huawei OceanStor storage system, when creating a clon...
Question 155: A customer project deploys an 8-node Huawei OceanStor 9000 C...
Question 156: Company W newly purchased two sets of storage devices for th...
Question 157: An enterprise has an online transaction system and an email ...
Question 158: In the homogeneous online migration scheme, the heterogeneou...
Question 159: In OceanStor 9000, what are the main scenarios for metadata ...
Question 160: Consideration of construction, operation and maintenance cos...
Question 161: HDD and SSD hard disks show huge performance differences und...
Question 162: In the Huawei HyperMetro active-active solution, when the li...
Question 163: Large e-commerce company A purchased Huawei's hyper-converge...
Question 164: Game live broadcast platform A uses Huawei's all-flash stora...
Question 165: A enterprise uses Huawei backup all-in-one machine for data ...
Question 166: In Huawei hybrid storage, the host can access any lun and fi...
Question 167: Which of the following statements is wrong about the protoco...
Question 168: Which of the following are common types of migration? (Multi...
Question 169: When configuring the active-active working mode, if the load...
Question 170: The deployment process of the disaster recovery system in Hu...
Question 171: In Huawei's distributed storage, the block service asynchron...
Question 172: Which of the extended statements about storage is true? (Mul...
Question 173: If there are 5 SAS disks and 3 SSD disks in a Huawei OceanSt...
Question 174: When a hard disk failure occurs in the Huawei hybrid flash s...
Question 175: Which of the following statements about the InfoEqualizer fe...
Question 176: For the migration in the AD domain environment, after the mi...
Question 177: In the Internet company's storage system, services A and B c...
Question 178: Which of the following file sizes must be considered when ca...
Question 179: The effective capacity of the storage device is less than th...
Question 180: Which of the following descriptions can cause value-added se...
Question 181: Center A has 3000G data, Center B has 1500G data, the dedupl...
Question 182: How to read the WWN number of the windows system?...
Question 183: A storage engineer in an enterprise needs to back up 800 GB ...
Question 184: The smartThin feature does not allocate all the space in adv...
Question 185: Which of the following are the current mainstream memory sto...
Question 186: During the configuration process of HyperMetro's HyperMetro ...
Question 187: An enterprise uses Huawei's all-flash storage system to supp...
Question 188: Which of the following drift groups does Huawei all-flash st...
Question 189: F Use ERP system, OA system, Windows and Linux operating sys...
Question 190: Engineer A discovers that the storage is abnormal during rou...
Question 191: A company has a set of Huawei storage devices (such as Huawe...