Valid HPE6-A73 Dumps shared by ExamDiscuss.com for Helping Passing HPE6-A73 Exam! ExamDiscuss.com now offer the newest HPE6-A73 exam dumps, the ExamDiscuss.com HPE6-A73 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com HPE6-A73 dumps with Test Engine here:
Examine the configuration of Core-1 and Core-2. AOS-CX switches configured as a VSX stack: Core1: Interlace lag 256 no shutdown no routing vlan trunk allowed all lacp mode active Interface 1/1/46 no shutdown lag 256 Interface 1/1/47 no shutdown lag 256 VSX Inter-switch-link lag 256 vsx-sync vsx-global exit Cofe2: interlace lag 250 no shutdown no routing vlan trunk allowed all lacp mode active Interlace 1/1/46 no shutdown lag 256 Interface 1/1/47 no shutdown lag 256 vsx inter-switch-link lag 256 exit When using the "show vsx status" command, the two switches fall to connect and successfully synchronize. What should the administrator do to fix this issue?