<< Prev Question Next Question >>

Question 23/33

An integrator is setting up arrays on an HPE Smart Array controller for a customer with eight drives. The controller supports several RAID options. The RAID volume must be able to tolerate any two drive failures without downtime.
Which solution should the integrator choose to meet the criteria?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (33q)
Question 1: A customer's design includes a 40GB uplink to their data cen...
Question 2: HOTSPOT Click one of the components in the Insight Display t...
Question 3: Which utility replaced the Array Configuration Utility?...
Question 4: A customer needs to use a Smart Array controller to meet the...
Question 5: Through HPE OneView, an integrator determines that n HPE Pro...
Question 6: Under which circumstance will a server integrator need to ac...
Question 7: What is a benefit of advanced memory protection on an HPE Pr...
Question 8: A customer needs a solution to prevent their five HPE ProLia...
Question 9: An integrator needs to install three HPE ProLiant BL460 Gen9...
Question 10: Which technology provides monitoring of power consumption at...
Question 11: Refer to the exhibit. (Exhibit) A customer is using HPE OneV...
Question 12: Which pre boot environment allows an integrator to update fi...
Question 13: A server integrator needs to ensure that IT staff can access...
Question 14: An integrator needs to ensure that an HPE ProLiant ML150 Gen...
Question 15: An integrator needs to run HPE Insight Diagnostics to run so...
Question 16: An integrator with 25 HPE ProLiant servers that run MS Windo...
Question 17: Refer to exhibit. (Exhibit) A customer environment has a var...
Question 18: An HPE ProLiant Gen9 server running Server 2012 located at a...
Question 19: A customer needs to mount a group virtual media and install ...
Question 20: Refer to the exhibit. A server integrator is configuring the...
Question 21: A customer needs to monitor device health, obtain warranty s...
Question 22: A customer's data center has cool air distributed by means o...
Question 23: An integrator is setting up arrays on an HPE Smart Array con...
Question 24: A customer has added a storage blade to its HPE c7000 BladeS...
Question 25: DRAG DROP Click and drag each HPE integrated management tool...
Question 26: While creating a baseline for the Gen9 blades in a new HPE c...
Question 27: A customer is planning where to locate their servers in the ...
Question 28: What is a benefit of using 20Gb FlexFabric converged network...
Question 29: An integrator uses HPE Insight Control server provisioning (...
Question 30: An integrator needs to connect a series of HPE ProLiant Gen9...
Question 31: An integrator needs to view the health status on HPE ProLian...
Question 32: An integrator installs an HPE ProLiant BL 460c Gen9 server i...
Question 33: An integrator using HPE Insight Diagnostics Online Edition c...