Valid NSE7_EFW-7.2 Dumps shared by ExamDiscuss.com for Helping Passing NSE7_EFW-7.2 Exam! ExamDiscuss.com now offer the newest NSE7_EFW-7.2 exam dumps, the ExamDiscuss.com NSE7_EFW-7.2 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com NSE7_EFW-7.2 dumps with Test Engine here:
Refer to the exhibit, which shows two configured FortiGate devices and peering over FGSP. The main link directly connects the two FortiGate devices and is configured using the set session-syn-dev <interface> command. What is the primary reason to configure the main link?
Correct Answer: D
The primary purpose of configuring a main link between the devices is to synchronize session information so that if one unit fails, the other can continue processing traffic without dropping active sessions. A: To have both sessions and configuration synchronization in layer 2.This is incorrect because FGSP is used for session synchronization, not configuration synchronization. B: To load balance both sessions and configuration synchronization between layer 2 and 3.FGSP does not perform load balancing and is not used for configuration synchronization. C: To have only configuration synchronization in layer 3.The main link is not used solely for configuration synchronization. D: To have both sessions and configuration synchronization in layer 3.The main link in an FGSP setup is indeed used to synchronize session information across the devices, and it operates at layer 3 since it uses IP addresses to establish the peering.