Valid E20-555 Dumps shared by ExamDiscuss.com for Helping Passing E20-555 Exam! ExamDiscuss.com now offer the newest E20-555 exam dumps, the ExamDiscuss.com E20-555 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com E20-555 dumps with Test Engine here:
An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR). The customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They shut down their production cluster for a scheduled DR test, failed over to the DR cluster, and continue their DR testing. Assume both clusters have identical shares, exports, and user authentication. Additionally, assume the client applications have been stopped and the DNS re-pointed. Which SyncIQ Policy method should be used to continue production operations?