<< Prev Question Next Question >>

Question 36/62

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible What action must be performed before adding the node?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (62q)
Question 1: Match each VxRail, data protection solution with its functio...
Question 2: What is a difference between vSAN Data-In-Transit Encryption...
Question 3: What is the correct CLI command to collect only the vCenter ...
Question 4: An implementation engineer is configuring the network firewa...
Question 5: An infrastructure system audit will begin in two weeks All d...
Question 6: Which command is used to restart the Loudmouth process on an...
Question 7: A systems engineer is tasked to configure a VxRail cluster a...
Question 8: After implementation, the implementation engineer observes e...
Question 9: What is a characteristic of the VxRail S Series node?...
Question 10: The VxRail Deployment Wizard is being used on a VxRail clust...
Question 11: During the activation of Internal SRS, the implementation en...
Question 12: What is a consideration when expanding a VxRail cluster? (Ch...
Question 13: A 2-node VxRail duster Is being deployed. Due to a preparati...
Question 14: What are the requirements for a customer-supplied VDS in a V...
Question 15: What is validated by running the Proactive Network Performan...
Question 16: A 2-node VxRail duster Is being deployed. Due to a preparati...
Question 17: Match each VxRail data protection solution with its function...
Question 18: Which VxRail model can only be installed with static rack ra...
Question 19: What is the maximum number of supported nodes for a VxRail c...
Question 20: Once a VxRail cluster has been acquired, what is the correct...
Question 21: What is validated by running the Proactive Network Performan...
Question 22: A customer has decided that they will be using the Spanning ...
Question 23: How must node ports on Dell EMC ToR switches be configured w...
Question 24: A VxRail Test Plan has been completed What is the protocol f...
Question 25: Which requirement must be met when expanding a 3-node VxRail...
Question 26: Match each VxRail configuration with its related characteris...
Question 27: Which series of VxRail nodes supports either Intel or AMD pr...
Question 28: A systems engineer needs to ensure that the VxRail system is...
Question 29: What is validated by running the Proactive VM Creation test ...
Question 30: A VxRail Manager VM must be configured as follows: * IP addr...
Question 31: Which VxRail Series is designed to support a VDI environment...
Question 32: A systems engineer needs to check the health of the nodes an...
Question 33: An implementation engineer is tasked with setting up Recover...
Question 34: What is a benefit of using the VxRail REST API?...
Question 35: What code is returned when a VxRail API request is executed ...
Question 36: An implementation engineer is expanding an existing VxRail E...
Question 37: Which vSAN rules are configured for the VXRAIL-SYSTEM-STORAG...
Question 38: An implementation engineer is configuring the network firewa...
Question 39: An implementation engineer is deploying a new VxRail cluster...
Question 40: What guideline should be followed when planning bandwidth be...
Question 41: What is a supported witness configuration for a 3+3+1 VxRail...
Question 42: From what location should NVT for VxRail be run?...
Question 43: An implementation engineer is deploying a new VxRail cluster...
Question 44: Which vSAN feature requires an All-Flash cluster?...
Question 45: A VxRail implementation engineer is validating the network e...
Question 46: A VxRail cluster is being deployed in a DMZ environment. Wha...
Question 47: A VxRail API request has been executed and the user account ...
Question 48: What is the correct CL! command to collect only the VxRail M...
Question 49: The VxRail Deployment Wizard is being used on a VxRail clust...
Question 50: A systems engineer needs to ensure that the VxRail system is...
Question 51: A company has multiple VxRail systems installed at geographi...
Question 52: When preparing to generate an As-Built Configuration Report,...
Question 53: An implementation engineer places a VxRail node into mainten...
Question 54: Which service determines the primary node after powering on ...
Question 55: What is the correct CLI command to collect only the vCenter ...
Question 56: What is a difference between vSAN Data-In-Transit Encryption...
Question 57: A VxRail E560F model was delivered six months ago and is now...
Question 58: Which VxRail model(s) has a non-mirrored IDSDM?...
Question 59: For which VxRail models must the iDRAC NIC Selection be set ...
Question 60: An implementation engineer is logged into the vSphere Client...
Question 61: An implementation engineer is in the validation phase of a V...
Question 62: Match each component of the VxRail HCI System Software to it...