Question 2/38

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible What action must be performed before adding the node?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (38q)
Question 1: What is the correct sequence of steps to perform a RASR Fact...
Question 2: An implementation engineer is expanding an existing VxRail E...
Question 3: What is the minimum number of VxRail nodes required for a vS...
Question 4: Match each component of the VxRail HCI System Software to it...
Question 5: A VxRail Test Plan has been completed What is the protocol f...
Question 6: A VxRail implementation engineer is validating the network e...
Question 7: A planned VxRail Stretched Cluster will have four hybrid nod...
Question 8: A systems engineer needs to check the health of the nodes an...
Question 9: What are the requirements for a customer-supplied VDS in a V...
Question 10: How should an administrator manually validate the DNS readin...
Question 11: Which command is used to restart the Loudmouth process on an...
Question 12: A VxRail E560F model was delivered six months ago and is now...
Question 13: A VxRail Cluster has just been deployed. Use the VxRail simu...
Question 14: A systems engineer is tasked to configure a VxRail cluster a...
Question 15: For which typical activity would the Full data migration set...
Question 16: Match each VxRail data protection solution with its function...
Question 17: An implementation engineer is performing a precheck on a VxR...
Question 18: Which requirement must be met when expanding a 3-node VxRail...
Question 19: What is the maximum number of supported nodes in a VxRail St...
Question 20: In addition to hardware monitoring, what is the purpose of t...
Question 21: For which VxRail models must the iDRAC NIC Selection be set ...
Question 22: A systems engineer is deploying a VxRail cluster. They want ...
Question 23: Which service determines the primary node after powering on ...
Question 24: During the activation of Internal SRS, the implementation en...
Question 25: Match each VxRail, data protection solution with its functio...
Question 26: A 2-node VxRail duster Is being deployed. Due to a preparati...
Question 27: Which vSAN feature requires an All-Flash cluster?...
Question 28: Which VxRail model(s) has a non-mirrored IDSDM?...
Question 29: What is the minimum number of VxRail nodes required for a vS...
Question 30: An implementation engineer is expanding an existing VxRail S...
Question 31: An implementation engineer is working with a customer to pre...
Question 32: An infrastructure system audit will begin in two weeks All d...
Question 33: What environmental components of a 3-node VxRail cluster mus...
Question 34: A VxRail solution will be deployed with the embedded vCenter...
Question 35: According to the VxRail PEQ Engagement Details worksheet, li...
Question 36: Which series of VxRail nodes supports either Intel or AMD pr...
Question 37: Which vCenter object is created automatically when deploying...
Question 38: What is the maximum number of supported nodes for a VxRail c...