Select the appropriate task to complete the section 2.2 of the work breakdown structure below:
2. Technician
2.1 Install rack
2.2 _________
2.3 Place fiber
2.4 Terminate fiber
2.5 Test fiber

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (135q)
Question 1: You have determined that your underground cable design requi...
Question 2: Centralized fiber cabling allows the use of pull-through cab...
Question 3: The RJ-45 is now known as the 8P8C style connector, per the ...
Question 4: An outside plant (OSP) cable must be placed under a pipeline...
Question 5: You have been asked to provide a UPS that is always serving ...
Question 6: An underfloor preset insert must be used in a post-tensioned...
Question 7: Exhibit: (Exhibit) In this future marina layout, what would ...
Question 8: You have been asked to spec the physical security requiremen...
Question 9: Assuming the total fill capacity of a pathway is 100 cables ...
Question 10: Surge currents due to lightning and other sources MUST be __...
Question 11: Firestop ________, in conjunction with steel wedging plates,...
Question 12: What is at the "root" of a DAS (distributive antenna system)...
Question 13: Which of the following should be used as a guideline for est...
Question 14: You are reviewing a building backbone design with a vertical...
Question 15: What warning tape color has the Common Ground Alliance (CGA)...
Question 16: You are designing a system requiring the transmission of dat...
Question 17: You are designing a cabling containment system installed ove...
Question 18: Designing an intrabuilding backbone involves the same option...
Question 19: When trying to control radio signals from leaking outside of...
Question 20: Which characteristic is an advantage of copper based media o...
Question 21: Which is NOT true about conformance quality?...
Question 22: A third bend is acceptable in a pull section shorter than 33...
Question 23: How many storm loading areas are there in the contiguous Uni...
Question 24: Assume that the optical power transmitted by a 62.5/125 mult...
Question 25: In a computer or control room where the plenum is used for h...
Question 26: Underground facilities are cables placed in subsurface condu...
Question 27: Which of the following is true about screened twisted pair c...
Question 28: You are designing a 4.9 GHz microwave system that is using r...
Question 29: A(n) ________ system is considered a mechanical firestop....
Question 30: When balanced twisted-pair copper cabling, return loss is a ...
Question 31: Which of the following is NOT provided by the ac grounding e...
Question 32: Generating multiple message frames containing identical data...
Question 33: What element is typically NOT part of a paging system?...
Question 34: You are designing the cabling infrastructure for a lab offic...
Question 35: Time division multiplexing (TDM) systems are designed to tra...
Question 36: Multiples of the basic frequency of an electrical waveform a...
Question 37: You are working with the Sheriff's Department to develop a p...
Question 38: The propagation and path loss of radio signals in the target...
Question 39: The MINIMUM recommended lighting requirement in a telecommun...
Question 40: FOTP is an acronym for which of the following?...
Question 41: The standard floor space coverage area for each building aut...
Question 42: The headend has several audio-video playback devices within ...
Question 43: Data representation including code translations, compression...
Question 44: This type of cable is an unbalanced system:...
Question 45: Which of the following is an alarm management output system?...
Question 46: What is the permitted substitutes for a fiber optic cable ra...
Question 47: Which is an advantage of stranded conductors over solid cond...
Question 48: The ability of a device to withstand electromagnetic disturb...
Question 49: What type of estimate is based on the cost of performing sim...
Question 50: To encroach on navigable waterways contact which of the foll...
Question 51: What type of material does NOT support combustion even under...
Question 52: Multiple TRs on the same floor should have a least one trade...
Question 53: The RECOMMENDED balanced twisted-pair cable for building bac...
Question 54: What is the standard floor space allocation used in an offic...
Question 55: Important considerations when designing telecommunications d...
Question 56: You are placing an entrance cable between two buildings conn...
Question 57: Which device supplies the radio signal into a DAS (distribut...
Question 58: Exhibit: A pay telephone using coins needs to be installed i...
Question 59: You are given a choice of methods of routing backbone cablin...
Question 60: A product is listed after it successfully completes a series...
Question 61: When designing an underfloor duct system, which of the follo...
Question 62: The recommended ratio of patch panels to horizontal cable ma...
Question 63: What is the minimum bend radius of an indoor backbone fiber ...
Question 64: The ability of a device, equipment, or system to perform wit...
Question 65: Which of the following correctly lists the lowest frequency ...
Question 66: The concept of the "security quandary" is based on providing...
Question 67: Which active DAS component is responsible for coupling input...
Question 68: What type of facility requires a building automation system ...
Question 69: A security program consists of three independent components....
Question 70: What is the appropriate impedance of coaxial cable for use w...
Question 71: The American Public Works Association has adopted the color ...
Question 72: Multimode optical fiber is generally used for campus or buil...
Question 73: Which of the following is NOT considered acceptable in an in...
Question 74: A campus backbone design linking two buildings requires that...
Question 75: Which of the following is the Canadian standard for the Desi...
Question 76: Select the appropriate task to complete the section 2.2 of t...
Question 77: For TRs that contain active equipment, what is the minimum t...
Question 78: The MINIMUM finished height of access flooring in a general ...
Question 79: Perimeter raceway systems should be used primarily for:...
Question 80: Within a data center, if you have a system which includes on...
Question 81: Which of the following is the international standard for pre...
Question 82: Phase difference is the relationship in time between two wav...
Question 83: Manholes between 12 and 20 feet long use two covers....
Question 84: An offset in a conduit run should be considered the equivale...
Question 85: What would be the pair color of pins 3 and 6 of a T568B 8 pi...
Question 86: You must extend a video systems backbone coax cable that was...
Question 87: Exhibit: In this future marina layout, assuming that there a...
Question 88: Horizontal slack in the form of bundled loops have been know...
Question 89: What is the typical slab thickness requirement for a two lev...
Question 90: You have just assumed management responsibility over an olde...
Question 91: In order to maximize its ability to send and receive, an ant...
Question 92: Premises optical fiber links should be tested:...
Question 93: What type of redundancy provides two additional units, modul...
Question 94: Cables are installed in a ceiling in a straight line. The ce...
Question 95: Which of the following statements best describes what a back...
Question 96: A SONET OC-1 channel can carry 672 voice signals and has a d...
Question 97: The inadvertent transposition of two conductors of separate ...
Question 98: ITU-T G.655 recommends which type of singlemode optical fibe...
Question 99: Often associated with raised flooring, a(n) ________ may con...
Question 100: In a home run conduit system, a single horizontal cable can ...
Question 101: If you have a 30 cm (12 in) wide data tray, what does ANSI/T...
Question 102: You are designing a horizontal distribution system that will...
Question 103: When labeling pathways, which one of the following guideline...
Question 104: Which one of the following is part of the security metric to...
Question 105: Using Ohms law, a circuit of 120 volts and a resistance of 1...
Question 106: The purpose of QoS on an IP network is for:...
Question 107: In a run requiring 15 m (50 ft) of cable between the floor d...
Question 108: Arial suspension strands and cable should usually be placed ...
Question 109: What is the expected life cycle, in years, of building autom...
Question 110: You are designing a firestop system for a hospital with seve...
Question 111: Which one of the following would meet the minimum horizontal...
Question 112: What is the maximum pulling force guideline for a 2 or 4 str...
Question 113: You are designing an audible alarm notification system for a...
Question 114: You are designing multi band UHF police radio and VHF fire r...
Question 115: You are designing a nurse call system for an assisted care f...
Question 116: Between the late 60's and until 1984, what was the service t...
Question 117: Aerial fiber optic cable spans of less than 328 feet can be ...
Question 118: For an analog camera, what is the normal frame rate in frame...
Question 119: What is the MAXIMUM horizontal cable length permitted for ce...
Question 120: Which of the following is NOT an advantage of access floor s...
Question 121: A backbone star topology shall have no more than______ level...
Question 122: All of the following are nominal wavelengths for laser light...
Question 123: When installing outlet boxes in ten private offices in an ar...
Question 124: When selecting poles for aerial telecommunications facilitie...
Question 125: The loop distance range in an "ethernet in the first mile" (...
Question 126: From a 1000 ft (305 m) roll of optical fiber, how many MAXIM...
Question 127: In an industry where a high level of humidity is measured, w...
Question 128: What is the MINIMUM vertical separation between the top rail...
Question 129: A tapped trunk topology uses ________ cabling to support a D...
Question 130: When installing a heavy backbone cabling vertically, recomme...
Question 131: An isolated ground receptacle may be identified by:...
Question 132: Vertical conduit masts (with approved service heads) are lim...
Question 133: A telephone facility and an electrical facility are required...
Question 134: All of the following are true about the post construction ph...
Question 135: Exhibit: (Exhibit) This diagram illustrates a ______________...