Valid AD0-E716 Dumps shared by ExamDiscuss.com for Helping Passing AD0-E716 Exam! ExamDiscuss.com now offer the newest AD0-E716 exam dumps, the ExamDiscuss.com AD0-E716 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com AD0-E716 dumps with Test Engine here:
An Adobe Commerce Cloud merchant has been experiencing significant downtime during production deployment. They have already checked that the application is in ideal state. In addition to the configuration of the SCD.MATRIX variable to reduce amount of unnecessary theme files, what would be the next steps to reduce the downtime?
Correct Answer: A
To minimize downtime during deployment, one of the most effective strategies is to configure static content deployment (SCD) to run during the build phase and optimize the number of threads used during the process. * Configuring SCD in the Build Phase: * Running SCD during the build phase reduces the amount of work required during the deployment phase, which helps in reducing downtime. * Increasing SCD.THREADS: * Increasing the number of threads (SCD.THREADS) speeds up the static content generation by utilizing more parallel processing, which can significantly reduce build time. * Why Option A is Correct: * Configuring SCD in the build phase and increasing SCD.THREADS are both recommended practices to minimize deployment time. * Option B's recommendation to decrease threads would slow down SCD, and Option C does not provide an active approach to adjust thread counts for optimizing the process. * References: * Adobe Commerce Cloud documentation on SCD Configuration