Question 207/215

A project activity not on the critical path has required 20% longer than the time originally allocated.
The project team should:

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (215q)
Question 1: The term "expected value" is closest to the term:...
Question 2: Handling of warranty returns, process improvement team meeti...
Question 3: From this list select the best example of Bias in Sampling....
Question 4: In problem 1, do the data indicate that the population for m...
Question 5: An experiment is conducted by checking the effect that three...
Question 6: A team is investigating ways to reduce power outages. They d...
Question 7: The method of Steepest Ascent guides you toward a target ins...
Question 8: A valid Multiple Linear Regression (MLR) is characterized by...
Question 9: The _____________ Distribution would be the most desirable f...
Question 10: When a Belt implements an improvement that is automated thus...
Question 11: An x-bar and R chart has four part measurements per sample T...
Question 12: Is this a left-tail, right-tail or two-tail test?...
Question 13: Calculate the main effect of factor A: (Exhibit)...
Question 14: Following process modifications, the Null Hypothesis states ...
Question 15: Screening experiments are the proper choice when a Belt is f...
Question 16: The Central Limit Theorem says that as the sample size becom...
Question 17: This table displays the inventory of fasteners in a storage ...
Question 18: A pharmaceutical manufacturer is designing an experiment to ...
Question 19: One of the foundations of Lean Six Sigma is the concept that...
Question 20: The Lean toolbox includes all of these items except ________...
Question 21: Find the value of (13) in the ANOVA table. Assume: (Exhibit)...
Question 22: This QFD matrix was used in the design process for a ball po...
Question 23: Find the value of (12) in the ANOVA table. Assume: (Exhibit)...
Question 24: This QFD matrix was used in the design process for a ball po...
Question 25: Which of these elements are not included in Implementation p...
Question 26: A Belt working in a supply chain environment has to make a d...
Question 27: A team wants a technique for displaying the connection betwe...
Question 28: For her injection molding project a Belt needed to track the...
Question 29: The following is a set of individual measurements: 3 5 4 5 6...
Question 30: To establish a sample size that will allow the proper overla...
Question 31: Find the average difference dbar. (Exhibit)...
Question 32: In a certain sampling situation, = 0, = 0.08. The power of t...
Question 33: Cost of Poor Quality (COPQ) can be classified as Visible Cos...
Question 34: The Lean toolbox includes all of the following items except ...
Question 35: For a batch manufacturing process, while assessing short ter...
Question 36: At a particular time, three components are in parallel and e...
Question 37: The average number of defects is 21.6. Find the upper contro...
Question 38: A population is bimodal. One hundred samples of size 30 are ...
Question 39: A set of data from a process has 8 readings per sample and 5...
Question 40: Those people who have an interest in the outputs of a proces...
Question 41: Which statement(s) are correct about the Regression shown he...
Question 42: The test statistic is approximately:...
Question 43: The Toronto plant produces appliances in the following distr...
Question 44: The following is a set of individual measurements: 3 5 4 5 6...
Question 45: The distribution is:
Question 46: What percent of population falls below the lower specificati...
Question 47: Using this partial Z Table, how many units from a month's pr...
Question 48: Which value of x will minimize transmitted noise? (Exhibit)...
Question 49: Which statement(s) are incorrect about Fractional Factorial ...
Question 50: A population of size 1,000,000 has mean 42 and standard devi...
Question 51: A set of data from a process has 8 readings per sample and 5...
Question 52: In a resolution III fractional factorial experimental design...
Question 53: Find the value of (5) in the ANOVA table. Assume: (Exhibit)...
Question 54: A ___________ is used primarily to track the stability of th...
Question 55: The word "champion" in the context of Six Sigma projects ref...
Question 56: If a process has subgroups for Variable data and the process...
Question 57: Fractional Factorial designs are used to reduce the time and...
Question 58: The temperature in a storage location is logged once every 3...
Question 59: A natural logarithmic base is not required for which of thes...
Question 60: A valid mathematical Regression represents all of the charac...
Question 61: If the value of the test statistic had been 7.03, what actio...
Question 62: Find Cp
Question 63: A higher resolution number for an experimental design indica...
Question 64: A process produced 1394 units. During this time 11 defects w...
Question 65: Assessing process proportion as opposed to evaluating a proc...
Question 66: The primary objective in removal of waste is to improve the ...
Question 67: What dollar amount of savings would a project show if it red...
Question 68: To be an effective Lean Six Sigma practitioner one must unde...
Question 69: If a Belt needed to model the data for the number of weaves ...
Question 70: A team's goal is to improve information flow in a payroll fu...
Question 71: When conducting a Hypothesis Test using Continuous Data the ...
Question 72: An x-bar control chart has been established with control lim...
Question 73: A Belt has determined that the inventory of repair parts at ...
Question 74: Which one of the listed tools is frequently used to help dri...
Question 75: A complex system has many causes and effects. These may be i...
Question 76: The Hardware Store ordered ten lawn mower from the manufactu...
Question 77: The distance between the Mean of a data set and the Point of...
Question 78: Sally and Sara sell flower pots at their garage sale. Martha...
Question 79: The calculation of Column Total times Row Total divided by G...
Question 80: A fundamental rule is that both Standard Deviation and Varia...
Question 81: When a Belt Poka-Yoke's a defect out of the process entirely...
Question 82: Find the value of (1) in the ANOVA table. Assume: (Exhibit)...
Question 83: Which statement(s) are most correct for the Regression Analy...
Question 84: Kaizens or Kaikakus and Six Sigma projects are intended to c...
Question 85: Find the value of (2) in the ANOVA table. Assume: (Exhibit)...
Question 86: Find the value of (10) in the ANOVA table. Assume: (Exhibit)...
Question 87: The critical value(s) is/are:
Question 88: When we compare short-term and long-term Capability which of...
Question 89: Find the value of (7) in the ANOVA table. Assume: (Exhibit)...
Question 90: Which statements are correct about the advanced Capability A...
Question 91: The class score distribution of schools in a metropolitan ar...
Question 92: A meeting is called for all three shifts to determine the se...
Question 93: Which statement(s) are incorrect for the Regression Analysis...
Question 94: Control Charts were developed by Dr. Shewhart to track data ...
Question 95: For the data shown here which statement(s) are true? (Note: ...
Question 96: Common and Special Cause ______________ are the focus of Sta...
Question 97: Which statement(s) are correct about the DOE Factorial plot ...
Question 98: On a _________________ a Belt screens variables, or various ...
Question 99: Find the value of (3) in the ANOVA table. Assume: (Exhibit)...
Question 100: The primary metric for a project is reduced cost for process...
Question 101: Fractional Factorial Designs are used to analyze factors to ...
Question 102: Using this data calculate the percentage of DPU. Data: 763 d...
Question 103: This table displays the inventory of fasteners in a storage ...
Question 104: A Belt rearranged the location of the parts inventory for a ...
Question 105: Deming called the technique of studying a sample to gain und...
Question 106: The Japanese born function of a Kanban event utilizes a spec...
Question 107: After a team has engaged in diversion activities they may ne...
Question 108: Which statement is NOT correct about the Fitted Line Plot sh...
Question 109: With Measurement System Analysis we are concerned with two i...
Question 110: If = 0.5, what is the critical value?...
Question 111: This experimental design is an example of: (Exhibit)...
Question 112: Customers make their decisions based on Features, Integrity ...
Question 113: The English words used for the 5S's are __________ , _______...
Question 114: When the Inputs, X's, for your process are Normally Distribu...
Question 115: Dr. Joseph M. Juran:
Question 116: A control chart will be used to monitor the number of scratc...
Question 117: An advantage of using standard deviation rather than range f...
Question 118: Find the value of m or b1:
Question 119: What aspects of Measurement Systems Analysis (MSA) studies a...
Question 120: The word takt is closest to the theory of constraints word:...
Question 121: This QFD matrix was used in the design process for a ball po...
Question 122: A team wants a technique for doing an initial study of a pro...
Question 123: Find the value of (9) in the ANOVA table. Assume: (Exhibit)...
Question 124: For a Kanban to be successful which of these must occur?...
Question 125: Data are collected in xy pairs and a scatter diagram shows t...
Question 126: A machine tool vender wants to sell an injection molding mac...
Question 127: A robust design is one which:
Question 128: A process shows the following number of defectives. Each sam...
Question 129: For the data set shown here which of these statements is/are...
Question 130: The two types of data that are to be used in Statistical Ana...
Question 131: The quality leader responsible for the term Total Quality Ma...
Question 132: An experiment has seven factors with two levels each. The ex...
Question 133: A team has been asked to reduce the cycle time for a process...
Question 134: The average weight of castings produced at the Nebraska foun...
Question 135: A random sample is selected from a population of measurement...
Question 136: A ___________ problem in the Measurement System suggests tha...
Question 137: A sample of size 50 from machine A has a mean of 18.2 and st...
Question 138: A random sample of 2500 printed brochures is found to have a...
Question 139: It would be more likely than not for a Belt conducting a Reg...
Question 140: Find the mean, median and mode of the following data set: 9,...
Question 141: This QFD matrix was used in the design process for a ball po...
Question 142: Which of these items contribute to what is necessary for suc...
Question 143: SPC Charts are used extensively in different business and de...
Question 144: An approach that would remove the contradiction identified i...
Question 145: Following the completion of a LSS project the Belt not only ...
Question 146: Production Line 1 is able to complete 500 units per shift. P...
Question 147: For a line in an FMEA form a team has established the follow...
Question 148: With Measurement System Analysis we are concerned with two i...
Question 149: Relative to a Design of Experiments the term Collinear refer...
Question 150: If a Six Sigma project was to reduce repair station inventor...
Question 151: If DPU = 0.022, the RTU is approximately:...
Question 152: An example of a project metric would be:...
Question 153: During the ______________ phase of 5S is when we might imple...
Question 154: If the probability that event A occurs is .51, the probabili...
Question 155: The reported Cpk for a process with an average of 98 units, ...
Question 156: A Personal Trainer was assessing her workout class participa...
Question 157: Which Element of Waste best describes "the unnecessary movem...
Question 158: P(A) = .42, P(B) = .58, P(A&amp;B) = .10. Are A and B (stati...
Question 159: A team wants a technique for obtaining a large number of pos...
Question 160: The class score distribution of schools in a metropolitan ar...
Question 161: A valid mathematical Regression represents all of the charac...
Question 162: If you can Poka-Yoke a defect out of the process entirely th...
Question 163: From this list select the items that define what an X-Y Diag...
Question 164: SCENARIO A Six Sigma team is measuring the moisture content ...
Question 165: The preferred method for determining statistically whether f...
Question 166: Which item(s) listed would impact the Process Capability for...
Question 167: A valid Multiple Linear Regression (MLR) is characterized by...
Question 168: Two of the key deliverables for the Measure Phase are a robu...
Question 169: Use the reliability formula from the previous problem to fin...
Question 170: This will be a:
Question 171: An assembly line has 3 × 3 squares painted behind each perso...
Question 172: What is the Ppk of a process with a spread of 24 units, an a...
Question 173: Find the value of b or b0:
Question 174: The Japanese born function of a Kaizen event utilizes a spec...
Question 175: The Central Limit Theorem states that the distribution of sa...
Question 176: A Process Map is created in order that a Belt can __________...
Question 177: Choose those characteristics of a Simple Linear Regression (...
Question 178: A population is bimodal with a variance of 5.77. One hundred...
Question 179: Use this data to calculate the Z Score. Average of: 92, Stan...
Question 180: Proposed Six Sigma projects that are not in some way linked ...
Question 181: Which Experimental Design typically is most associated with ...
Question 182: As a means of measuring the effects on other areas of a proc...
Question 183: Customer segmentation refers to:...
Question 184: A and B are events. P(A) = 0.80 and P(B) = 0.90....
Question 185: As opposed to earlier emphases lean manufacturing tends to s...
Question 186: An automatic gaging system is to be installed in a process. ...
Question 187: An x-bar and R chart is used to monitor a process. One week ...
Question 188: Some of the sources for different types of error that can be...
Question 189: On a _________________ one can see a pattern from the graphe...
Question 190: A(n) ______________ is best used to compare a Machine 1 aver...
Question 191: The overall tolerance for three components in series in an e...
Question 192: A Belt working in a supply chain environment has to make a d...
Question 193: What dollar amount of savings would a project show if it red...
Question 194: This QFD matrix was used in the design process for a ball po...
Question 195: A Full Factorial experiment using a 2 level 4 factor approac...
Question 196: The Greek letter "sigma" is used by mathematicians to signif...
Question 197: Six Sigma is a business improvement discipline whose fundame...
Question 198: Statistical Difference is the magnitude of difference or cha...
Question 199: The number of factors, levels and replications:...
Question 200: Of the various types of data shown below which is NOT repres...
Question 201: An ANOVA used across many dependent variables could increase...
Question 202: P(A) = .42, P(B) = .58 P(A&amp;B) = .10. Are A and B mutuall...
Question 203: The English words used for the 5S's are Sorting, Straighteni...
Question 204: A set of data from a process has 8 readings per sample and 5...
Question 205: When a Belt decides to use written procedures and visual con...
Question 206: A project whose definition does not include performance metr...
Question 207: A project activity not on the critical path has required 20%...
Question 208: A Six Sigma project designed to solve a particular problem n...
Question 209: Situations where standardized work needs to be incorporated ...
Question 210: To properly analyze the variables impacting the output of a ...
Question 211: Calculate the Rolled Throughput Yield of this process using ...
Question 212: Relative to a Design of Experiments the term _______________...
Question 213: The diameters of 50 randomly selected shafts have a mean of ...
Question 214: The Waste of Overproduction is defined as __________________...
Question 215: An x-bar and R chart has four part measurements per sample T...