<< Prev Question Next Question >>

Question 34/39

Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing "no differing sit conditions" and "no damage for delay" clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
"normal" schedule and $3,200 for the "crashed" schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor's operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the "normal" schedule, what is the cost of this hammock?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (39q)
Question 1: Determine the correct formula and date for the late start fo...
Question 2: Theoretically construct a summary activity for activities 60...
Question 3: Which of the following are NOT considerations or constraints...
Question 4: When reconstructing a CPM schedule electronically from a har...
Question 5: What is the primary difference between the arrow diagramming...
Question 6: Identify the minimum project duration. (Exhibit)...
Question 7: Determine the correct formula and date for the late finish f...
Question 8: Each column must be poured in one day. Each column requires ...
Question 9: In the "normal" schedule, excluding Activity 1000, what acti...
Question 10: What problems can a soils engineer deal with on a project?...
Question 11: What method would be the best way to determine the most like...
Question 12: An earned value-based project control system can use either ...
Question 13: Total float is defined as the amount of time an activity can...
Question 14: What does the narrow band at "Y" represent? (Exhibit)...
Question 15: Is activity 7001 pictured correctly in the precedence diagra...
Question 16: Using the "normal" schedule, if you start Activity 7001 on A...
Question 17: Theoretically construct a summary activity for activities 20...
Question 18: What activities are concurrent to Activity 2001 in the "norm...
Question 19: Identify the late finish to develop plans and specs. (Exhibi...
Question 20: Which of the following will always describe the critical pat...
Question 21: Which of the following types of delay will NOT result in a t...
Question 22: Constraints control events or activities that ______________...
Question 23: For which of these delays should an owner grant a time exten...
Question 24: How many work days does it take to move the product from tes...
Question 25: Why does activity 1001 have two successor activities? (Exhib...
Question 26: In order for a claimant to be entitled to an extension of co...
Question 27: In its simplest form, what is the main drawback of critical ...
Question 28: Using the "normal" schedule, what is the early finish date o...
Question 29: If after calculating a schedule an activity exhibits negativ...
Question 30: The expected remaining cost needed to complete an activity, ...
Question 31: Activity C is a
Question 32: Time-scaled logic diagrams are
Question 33: Which of the following is NOT true?...
Question 34: Scenario: The entire network consists of the following activ...
Question 35: Activity durations are normally estimated in an intuitive an...
Question 36: You are retained by a contractor who asks you to perform a s...
Question 37: Which letter of the alphabet best approximates the graphical...
Question 38: These are the activities on the critical path: (Exhibit)...
Question 39: Determine the correct formula and date for the late finish f...