<< Prev Question Next Question >>

Question 69/74

If there are inspection specifications from both the variant configuration and the task list or material specification that are relevant for the characteristic, the material specification take precedence over those from the specifications from the variant configuration.

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (74q)
Question 1: Which statements are correct? (More than one answer is true....
Question 2: The audit plan is hierarchically structured...
Question 3: Which statements are correct? (More than one answer is true....
Question 4: A customer complaint to be recorded in the following ways (m...
Question 5: The test equipment in the maintenance plan is copied to the ...
Question 6: Pl Sheet is available for _____....
Question 7: The function module can be called before, after or at the sa...
Question 8: During inspection planning, you cannot access different mast...
Question 9: The dynamic modification rule defines the inspection stages ...
Question 10: An inspection characteristic describes the inspection criter...
Question 11: A valuation may be in recorded for every question in the que...
Question 12: Info structures are special statistics tables, in which the ...
Question 13: An activity consists of the following elements (more than on...
Question 14: Which object must combined in test scheduling in the stabili...
Question 15: A buyer wants to quality management department to approve a ...
Question 16: You can use a follow-up function to trigger a Workflow task....
Question 17: To use an inspection plan without multiple specification , y...
Question 18: Which statements are correct? (More than one answer is true....
Question 19: You can use the quality notifications to support the RMA (re...
Question 20: The following notification origins exist for the notificatio...
Question 21: Which of the following physical sample categories can you cr...
Question 22: You can use the Quality Notifications to support the RMA (Re...
Question 23: If no alternative unit of measure is entered in the material...
Question 24: Your customer user action boxes in the notification processi...
Question 25: The QM control key in the procurement data of the material m...
Question 26: Which statement is correct?
Question 27: Follow-up functions that support complaints against the vend...
Question 28: During an audit you document a finding. In the audit structu...
Question 29: The following notification origins exist for the notificatio...
Question 30: Which Quality notifications origin Q2 belongs to...
Question 31: The quality inspector records defects in results recording f...
Question 32: Inspection lots can always only be created with reference to...
Question 33: Your customer requires the lab to use quantitate characteris...
Question 34: The inspection types and their process parameters can be ass...
Question 35: The internal service request (ISR) is used to enter and proc...
Question 36: Which process step can automatically create a quality notifi...
Question 37: The life cycle of a control chart are, (More than one answer...
Question 38: Confirmation at Reporting point is available for ____....
Question 39: Inspection lots can always only be created with reference to...
Question 40: You can create a where-used list for the following QM-specif...
Question 41: Which type of task list defines process steps independently ...
Question 42: If inspection lots have already been created for the storage...
Question 43: A customer complaint can be recorded in the following ways: ...
Question 44: The inspection lot forms the basis for inspection processing...
Question 45: The unit of measurement, target value, accuracy, and upper a...
Question 46: The following notification origins exist for the notificatio...
Question 47: PI Sheet are available for Which statement is correct? (Plea...
Question 48: Specifications are copied form t he inspection lot to the in...
Question 49: On the basis of the vendor or manufacturer quality informati...
Question 50: Results recording can be performed for all operations....
Question 51: If you want to determine the stage at which quality control ...
Question 52: A unit to be inspected corresponds in this function to __....
Question 53: Flexible inspection specifications are to be used where insp...
Question 54: You want to print a certificate for an outbound delivery, at...
Question 55: Inspection lots can always only be created with reference to...
Question 56: Business Content provides the range of information that your...
Question 57: When you plan an audit for which component can you define pa...
Question 58: You can assign follow-up actions to the codes in the code gr...
Question 59: Which are related to "Function group QMLR"? Which statements...
Question 60: Which business object must you use to create a stability stu...
Question 61: Which statements are correct? (More than one answers are tru...
Question 62: Which Status allows you to make a usage decision without usi...
Question 63: You can define several follow-up functions that belong to th...
Question 64: A material-dependent selection of defect codes cannot be pla...
Question 65: Statistical process control: Standardized statistical value ...
Question 66: Which copy model must user maintain in a Master inspection c...
Question 67: Which statements are correct? (More than one answer is true....
Question 68: Your customer wants to periodically calibrate the quality ma...
Question 69: If there are inspection specifications from both the variant...
Question 70: QM in integrated in the processes of the logistics supply ch...
Question 71: Which statement is correct?
Question 72: The standard workflow processes in the notifications area ar...
Question 73: You can access the inspection history from:...
Question 74: The Quality notifications origin Q2 belongs to ______...